|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 12/6/2017 Measured TD: 7414 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 12/6/2017 | | Wellbore Permit | DRIFTED | | Permit #: | 19931792 | Expiration Date: | 3/31/1994 | | Proposed Depth/Form: | 7368 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2SW |
| | |
| Wellbore Completed | | Completion Date: | 2/4/1994 | | Spud Date: | 1/20/1994 | Spud Date Is: | ACTUAL | | Measured TD: | 7414 ft. | Measured PB depth: | 7362 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIFL/GR; CDL/GR; CCL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 808 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 418, Top: 0 ft., Bottom: 808 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 7404 ft., Weight: 7.7 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6200 ft., Bottom: 7404 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7404 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 560, Top: 3665 ft., Bottom: 5016 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3923 ft. | | N | N | | SUSSEX | 4316 ft. | | N | N | | NIOBRARA | 6893 ft. | 7188 ft. | N | N | | FORT HAYS | 7188 ft. | 7210 ft. | N | N | | CODELL | 7210 ft. | 7226 ft. | N | N |
Formation CODL Formation Classification: GW Status: CM - 1/18/2006 Interval Top: 7212 ft. Interval Bottom: 7226 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/10/1994 | Choke Size: | 0.313 in. | | Formation Name: | CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/4/1994 | | Treatment Summary: | FRAC W/45,260 GAL WTR W/CLAYTREAT W/35# GUAR & 186,800# 20/40 MESH SAND,2/1994. // REPERF CODL 7212'-7226' (56 HOLES) REFRAC CODL W/130,746 GAL VISTAR 23/24/25# GEL & 244,691# 20/40 SAND, 3/24/04. |
| | Tubing Size: | 2.0625 in. | Tubing Setting Depth: | 7192 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/14/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 11 | | BBLS_OIL | 9 | | BTU_GAS | 1320 | | CALC_BBLS_H2O | 11 | | CALC_BBLS_OIL | 9 | | CALC_GOR | 11556 | | CALC_MCF_GAS | 104 | | CASING_PRESS | 320 | | GRAVITY_OIL | 55.2 | | MCF_GAS | 104 | | TUBING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 7212 ft. | # Of Holes: | 76 | | Interval Bottom: | 7226 ft. | Hole Size: | 0.34 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 12/6/2017 Interval Top: 6964 ft. Interval Bottom: 7226 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/6/2006 | Choke Size: | 0.281 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/4/1994 | | Treatment Summary: | COMMINGLE NBRR & CODL. CODELL PERFS: 7212' - 7226', 76 HOLES |
| | Tubing Size: | 2.0625 in. | Tubing Setting Depth: | 7192 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/18/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 11 | | BBLS_OIL | 10 | | CALC_BBLS_H2O | 11 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 96 | | CALC_MCF_GAS | 104 | | CASING_PRESS | 650 | | MCF_GAS | 104 | | TUBING_PRESS | 410 |
| | Perforation Data: | | Interval Top: | 6964 ft. | # Of Holes: | 184 | | Interval Bottom: | 7226 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 1/18/2006 Interval Top: 6964 ft. Interval Bottom: 6982 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/6/2006 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/4/1994 | | Treatment Summary: | 1000 GAL 15% HCI ACID BREAKDOWN; 68,670 GAL SLICKWATER PAD; 98,804 GALS SILVERSTIM W/28# GEL; 238,540# 30/50 OTTAWA SAND; 12,000# 12/20 MESH. ATP:4654PSI, ATR:32.1 BPM |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6964 ft. | # Of Holes: | 108 | | Interval Bottom: | 6982 ft. | Hole Size: | 0.27 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/06/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|