Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-17702
Well Classification: OW Status: TA - 2/1/2021
Well Name/No:UPRC #33-11J5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date2/1/2021
FacilityID:249899LocationID:329677
County:WELD #123Location:NESW 33 3N65W 6
Field:WATTENBERG - #90750Elevation:4843 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1982FSL  1975 FWLLat/Long: 40.179917 / -104.671087Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.179589 / -104.670309Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 2/1/2021             Measured TD: 7402 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 2/1/2021
Wellbore Permit
Permit #:19931791 Expiration Date:3/31/1994
Proposed Depth/Form:7299 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2SW

Wellbore Completed
Completion Date:2/2/1994
Spud Date:1/21/1994Spud Date Is:ACTUAL
Measured TD:7402 ft.Measured PB depth:7338 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIFL/GR; CDL/GR; CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 760 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 760 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 7391 ft., Weight: 7.7 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: 6296 ft., Bottom: 7391 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4850 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 3774 ft., Bottom: 4850 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3918 ft.NN
SUSSEX4248 ft.NN
NIOBRARA6888 ft.NN
FORT HAYS7176 ft.NN
CODELL7198 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  TA - 2/1/2021                  Interval Top: 7200 ft.    Interval Bottom: 7212 ft.

 Completed Information for Formation CODELL
1st Production Date:11/16/2004Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/2/1994
Treatment Summary:FRAC W/48,080 GAL WTR W/CLAYTREAT W/35# GUAR & 190,000# 20/40 MESH SAND. // REPERF CODL 7200-7212'(48 HOLES); RE-FRAC'D CODL W/130,620 GAL VISTAR 24# GEL & 245,920# 20/40 SAND, 11/16/04
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 14
BTU_GAS 1296
CALC_BBLS_H2O 4
CALC_BBLS_OIL 14
CALC_GOR 7786
CALC_MCF_GAS 109
CASING_PRESS 600
GRAVITY_OIL 52.4
MCF_GAS 109
TUBING_PRESS 180
Perforation Data:
Interval Top:7200 ft.# Of Holes:48
Interval Bottom:7212 ft.Hole Size:0.25 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA)YLast Production
10/31/2019
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No