|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/21/2023 Measured TD: 7981 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/21/2023 | | Wellbore Permit | DRIFTED | | Permit #: | 20040039 | Expiration Date: | 1/25/2005 | | Proposed Depth/Form: | 7981 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 160, Drill Unit: SE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: SE4 | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: 493-2 , Unit Acreage: 160, Drill Unit: SE4 |
| | |
| Wellbore Completed | | Completion Date: | 1/29/2002 | | Spud Date: | 12/16/1993 | Spud Date Is: | ACTUAL | | Measured TD: | 7981 ft. | Measured PB depth: | 7959 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL, NGT, CDL, CBL | | Log Types: | CBL - VDL - GR - CCL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 624 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 624 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7467 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 4175 ft., Bottom: 7467 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7411 ft., Depth: 7981 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 35, Top: 7411 ft., Bottom: 7981 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4378 ft. | | N | N | | NIOBRARA | 7036 ft. | | N | N | | FORT HAYS | 7322 ft. | | N | N | | CODELL | 7344 ft. | | N | N | | CARLILE | 7361 ft. | | N | N | | GREENHORN | 7374 ft. | | N | N | | BENTONITE | 7643 ft. | | N | N | | MOWRY | 7793 ft. | | N | N | | J-2 SAND | 7810 ft. | | N | N | | SKULL CREEK | 7910 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 3/21/2023 Interval Top: 7809 ft. Interval Bottom: 7850 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/29/2022 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/29/2002 | | Treatment Summary: | FRAC W/550,000# 20/40 FRAC SAND IN 225,000 GALS FRAC GEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7809 ft. | # Of Holes: | 144 | | Interval Bottom: | 7850 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 12/19/2022 Interval Top: 7344 ft. Interval Bottom: 7366 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/1/1999 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7344 ft. | # Of Holes: | 45 | | Interval Bottom: | 7366 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/15/2004 Interval Top: 7064 ft. Interval Bottom: 7850 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/1/2003 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/29/2002 | | Treatment Summary: | JSND-NB-CD COMMINGLE. RELEASED RBP@7320' TO COMMINGLE THE J SAND-NBRR-CODL// DEEPEN HOLE TO 7981'. RUN 2 7/8" LINER, HANG TOP @ 7411', BOTTOM @ 7981'. CMT W/ 35 SXS. LAND FRAC STRING @ 7416'. PERF J SAND FROM 7809-7815' & 7820-7850' W/ 4 SPF (144 HOLES). FRAC W/ 550,000# 20/40 FRAC SAND IN 225,000 GALS FRACGEL 24# & 26#. FLOW BACK./ RUN PROD TBG. SWAB BACK.// CIRC. SAND OUT FROM 7,106'-PBTD 7,954'. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7394 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/15/2004 | Test Method: | FLOWING | | Hours Tested: | 19 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 28 | | BBLS_OIL | 14 | | CALC_BBLS_H2O | 28 | | CALC_BBLS_OIL | 14 | | CALC_GOR | 41428 | | CALC_MCF_GAS | 580 | | CASING_PRESS | 720 | | MCF_GAS | 580 | | TUBING_PRESS | 610 |
| | Perforation Data: | | Interval Top: | 7064 ft. | # Of Holes: | 560 | | Interval Bottom: | 7850 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/21/2023 Interval Top: 7064 ft. Interval Bottom: 7366 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/1/1999 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/23/2010 | | Treatment Summary: | NIOBRARA - REFRACD 7064-7270 WITH 151242 GAL FRAC FLUID AND 250120# SAND
CODELL - REFRACD 7344-7366 WITH 125583 GAL FRAC FLUID AND 250220# SAND | | Formation Treatment | | Treatment Date: | 1/29/2002 | | Treatment Summary: | NB-CD RECOMPLETION; SET RBP@7320'. FRAC'D THE NBRR 7080'-7270' W/114,700 GAL FRAC FLUID & 200,160 SAND. 04/15/04 ALSO SEE SCANNED DOC 00590485. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 18 | | BBLS_OIL | 4 | | BTU_GAS | 1238 | | CALC_BBLS_H2O | 18 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 22000 | | CALC_MCF_GAS | 200 | | CASING_PRESS | 712 | | GRAVITY_OIL | 61 | | MCF_GAS | 200 | | TUBING_PRESS | 461 |
| | Perforation Data: | | Interval Top: | 7064 ft. | # Of Holes: | 458 | | Interval Bottom: | 7366 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 12/19/2022 Interval Top: 7064 ft. Interval Bottom: 7270 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/1/1999 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7064 ft. | # Of Holes: | 413 | | Interval Bottom: | 7270 ft. | Hole Size: | |
|
Formation SUSX Formation Classification: GW Status: AB - 12/8/2022 Interval Top: 4659 ft. Interval Bottom: 4681 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | 4/6/1995 | Choke Size: | | | Formation Name: | SUSSEX | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/29/2002 | | Treatment Summary: | SET RBP @ 4998', PKR @ 4270'. PUMP 100 SXS CLASS G + 1% CAC12 & 100 SXS CLASS G NEAT. RELEASE PKR. DRILLOUT CMT. POOH W/ RBP. // 7064' TO 7222' ACIDIZE NBRR W/ 2500 GALLONS 10% HCL 7344' TO 7366' FRAC W/ 300,000# 20/40 SAND IN 95,466 GALLONS GEL 7064' TO 7222' FRAC W/ 300,000# 20/40 SAND IN 102,690 GALLONS GEL 4659' TO 4681' FRAC W/ 234,000# 20/40 SAND, 16,000# 12/20 SAND IN 53,970 GALLONS GEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SUSX. |
| | Perforation Data: | | Interval Top: | 4659 ft. | # Of Holes: | 88 | | Interval Bottom: | 4681 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/21/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|