|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/20/2020 Measured TD: 7282 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/20/2020 | | Wellbore Permit | | | Permit #: | 931526 | Expiration Date: | 2/11/1994 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: S2SW |
| | |
| Wellbore Completed | | Completion Date: | 12/21/1993 | | Measured TD: | 7282 ft. | Measured PB depth: | 0 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 472 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 0 ft., Bottom: 472 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7274 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 420, Top: 3924 ft., Bottom: 7274 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4351 ft. | | | | | NIOBRARA | 6830 ft. | | | | | FORT HAYS | 7104 ft. | | | | | CODELL | 7128 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 4/12/2019 Interval Top: 7129 ft. Interval Bottom: 7140 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 12/21/1993 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 8/22/2019 | Treatment End Date: | N/A | | Treatment Summary: | 9/25/1998: Codell refrac 7129' - 7140', 22 holes, 2601 lbs 20/40, 5000 lbs 100 mesh, 2832 bbls slurry | | Total fluid used in treatment (bbls): | 2832 | Max pressure during treatment (psi): | 5356 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | 7601 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 1/11/2008 | | Treatment Summary: | NEW PERFS 7129' - 7140', 22 NEW HOLES. 165,799 GALS FLUID & 115,020 LBS 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7129 ft. | # Of Holes: | 68 | | Interval Bottom: | 7140 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/20/2020 Interval Top: 6832 ft. Interval Bottom: 7140 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/21/1993 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/21/1993 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1234 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 12 | | CALC_GOR | 12167 | | CALC_MCF_GAS | 146 | | CASING_PRESS | 420 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 6832 ft. | # Of Holes: | 200 | | Interval Bottom: | 7140 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 4/12/2019 Interval Top: 6832 ft. Interval Bottom: 7018 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/21/1993 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/16/2008 | | Treatment Summary: | 162,408 GALS FLUID & 252,700 LBS 30/50 SAND & 4000 LBS 20/40 SAND. NEW PERFS 6998' - 7118', 240 NEW HOLES |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6832 ft. | # Of Holes: | 132 | | Interval Bottom: | 7018 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/20/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|