|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 3/25/2024 Measured TD: 8009 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 3/25/2024 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 4/22/2012 | | Proposed Depth/Form: | 8002 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: SE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 317 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 210, Top: 0 ft., Bottom: 317 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8002 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 6578 ft., Bottom: 8002 ft. | | Casing: | String Type: 1ST LINER, Hole Size: , Size: , Top: , Depth: 928 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 245, Top: 10 ft., Bottom: 928 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4727 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 190, Top: 3702 ft., Bottom: 4727 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/5/2005 | | Spud Date: | 10/30/1993 | Spud Date Is: | ACTUAL | | Measured TD: | 8009 ft. | Measured PB depth: | 7691 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL/DCL/CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 317 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: 0 ft., Bottom: 317 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8002 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 6580 ft., Bottom: 8002 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 928 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 245, Top: 0 ft., Bottom: 928 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4727 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 190, Top: 3702 ft., Bottom: 4727 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4274 ft. | | N | N | | NIOBRARA | 7110 ft. | | N | N | | CODELL | 7400 ft. | | N | N | | J SAND | 7831 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 3/25/2024 Interval Top: 7850 ft. Interval Bottom: 7860 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/4/1994 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/4/2010 | | Treatment Summary: | SET SNAD PLUG @ 7620'. | | Formation Treatment | | Treatment Date: | 11/5/2005 | | Treatment Summary: | 144,984 GALS GEL W/ 8,000# 100 MESH SAND & 400,000# 20-40 SAND; FLUSH W/ 5,124 GALS 2% CLAYTREAT WTR. ISDP 1990#. ATP 3275# @ 35 BPM. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 16 | | BBLS_OIL | 2 | | CALC_BBLS_H2O | 16 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 130000 | | CALC_MCF_GAS | 260 | | CASING_PRESS | 680 | | MCF_GAS | 260 | | TUBING_PRESS | 520 |
| | Perforation Data: | | Interval Top: | 7850 ft. | # Of Holes: | 30 | | Interval Bottom: | 7860 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 4/27/1999 Interval Top: 7402 ft. Interval Bottom: 7422 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/30/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/11/2010 | | Treatment Summary: | REPERF CODL 7402-7422 HOLES 20 SIZE 0.40. TRI-FRAC CODL W/ 163,520 GAL SW & 115,140# 40/70 SAND & 4,060# SB EXCEL. | | Formation Treatment | | Treatment Date: | 11/5/2005 | | Treatment Summary: | ORIGINAL COMPLETION: 64,000 GALS SATURN III 40/35 HT/HC/D CROSSLINKED GEL CONTAINING 210,000# 20-40 SAND. 11/05: 122,229 GALS FLUID; 261,120 LBS 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 12 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 12 | | CALC_GOR | 4670 | | CALC_MCF_GAS | 56 | | CASING_PRESS | 994 | | GRAVITY_OIL | 49.5 | | MCF_GAS | 56 | | TUBING_PRESS | 372 |
| | Perforation Data: | | Interval Top: | 7402 ft. | # Of Holes: | 70 | | Interval Bottom: | 7422 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/25/2024 Interval Top: 7130 ft. Interval Bottom: 7422 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/30/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/11/2010 | | Treatment Summary: | NBRR PERF 7130-7266 HOLES 66 SIZE 0.42. CODL PERF 7402-7422 HOLES 70 SIZE 0.42. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7363 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/9/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1290 | | CALC_BBLS_OIL | 17 | | CALC_GOR | 6118 | | CALC_MCF_GAS | 104 | | CASING_PRESS | 1300 | | GRAVITY_OIL | 50 | | TUBING_PRESS | 1100 |
| | Perforation Data: | | Interval Top: | 7130 ft. | # Of Holes: | 136 | | Interval Bottom: | 7422 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 12/3/2010 Interval Top: 7130 ft. Interval Bottom: 7266 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/30/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/11/2010 | | Treatment Summary: | FRAC NBRR W/ 500 GAL 15% HCL & 248,134 GAL SW & 201,060# 40/70 SAND & 4,120# SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7130 ft. | # Of Holes: | 66 | | Interval Bottom: | 7266 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/25/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|