Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-17359
Well Classification: OW Status: PA - 8/6/2019
Well Name/No:DIETRICH #6-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/6/2019
FacilityID:249556LocationID:329442
County:WELD #123Location:NWSE 6 4N64W 6
Field:WATTENBERG - #90750Elevation:4806 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1970FSL  1980 FELLat/Long: 40.339446 / -104.590875Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.338918 / -104.590856Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 8/6/2019             Measured TD: 7274 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 8/6/2019
Wellbore PermitDRIFTED
Permit #:19931262 Expiration Date:1/11/1994
Proposed Depth/Form:7167 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2SE4

Wellbore Completed
Completion Date:10/26/1993
Spud Date:9/24/1993Spud Date Is:ACTUAL
Measured TD:7274 ft.Measured PB depth:7149 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIFL/GR, CDL/GR, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 546 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 210, Top: 0 ft., Bottom: 546 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7210 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 145, Top: 6274 ft., Bottom: 7210 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3778 ft.NN
SUSSEX4258 ft.NN
NIOBRARA6770 ft.NN
FORT HAYS7023 ft.NN
CODELL7046 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/26/2019                 Interval Top: 7047 ft.    Interval Bottom: 7063 ft.

 Completed Information for Formation CODELL
1st Production Date:11/3/1993Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/8/2019Treatment End Date:N/A
Treatment Summary:6/1/2000: Codell Refrac from 7047' - 7063', 4 SPF, 64 shots, 0.34 diameter, with 3,062 bbls slurry, 245,500 lbs 20/40
Total fluid used in treatment (bbls):3062Max pressure during treatment (psi):5744
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):245500Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/26/1993
Treatment Summary:60,341 GALS WTR W/ CLAYTREAT W/ 35# GUAR W/ 192,800# 20-40 MESH SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7047 ft.# Of Holes:84
Interval Bottom:7063 ft.Hole Size:0.39 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 8/6/2019                  Interval Top: 6788 ft.    Interval Bottom: 7058 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/3/1993Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/26/2009
Treatment Summary:CODL PERFS FROM 7047-63', TRI-FRAC'D CODL W/ 130,704 GALS SLICKWATER & VISTAR W/ 244,420# OTTAWA SAND. COMMINGLE NBRR & CODL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 5
BTU_GAS 1215
CALC_BBLS_H2O 1
CALC_BBLS_OIL 5
CALC_GOR 16000
CALC_MCF_GAS 80
CASING_PRESS 400
GRAVITY_OIL 57
MCF_GAS 80
TUBING_PRESS 400
Perforation Data:
Interval Top:6788 ft.# Of Holes:336
Interval Bottom:7058 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 3/26/2019                 Interval Top: 6788 ft.    Interval Bottom: 6931 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/3/1993Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/26/2009
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 15
BTU_GAS 1225
CALC_BBLS_H2O 5
CALC_BBLS_OIL 15
CALC_GOR 5933
CALC_MCF_GAS 89
CASING_PRESS 160
GRAVITY_OIL 52.4
MCF_GAS 89
Perforation Data:
Interval Top:6788 ft.# Of Holes:252
Interval Bottom:6931 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/06/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No