Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-17267
Well Classification: GW Status: PR - 8/1/2025
Well Name/No:PHILLIPS #23-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:59725
Facility Status:PRStatus Date8/1/2025
FacilityID:249464LocationID:329379
Municipality/County:GREELEY / WELD #123Location:NENE 23 5N67W 6
Field:WATTENBERG - #90750Elevation:4959 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:652FNL  658 FELLat/Long: 40.390324 / -104.853364Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.390431 / -104.853314Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/1/2025             Measured TD: 8240 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/1/2025
Wellbore Permit
Permit #:931081 Expiration Date:12/17/1993
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:10/4/1993
Measured TD:8240 ft.Measured PB depth:7912 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 0 FL  0 FL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 394 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 394 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 8000 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 6685 ft., Bottom: 8000 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6994 ft.
CODELL7334 ft.

Formation CODL                     Formation Classification:  GW                     Status:  PR - 8/1/2025                  Interval Top: 7336 ft.    Interval Bottom: 7349 ft.

 Completed Information for Formation CODELL
1st Production Date:10/4/1993Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/4/1993
Treatment Summary:REFRACED CODELL W/260,100# 20-40 SD, USING 121,464 GAL 22#, 20#, AND 18# VISTAR GEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 2
CALC_GOR 26000
CASING_PRESS 620
MCF_GAS 52
TUBING_PRESS 600
Perforation Data:
Interval Top:7336 ft.# Of Holes:80
Interval Bottom:7349 ft.Hole Size:3 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)404
Total Gas Produced (MCF)9651
GOR23888
GOR DeterminationMCFE
Average BOE per Day5.646
Average MCFE per Day32.750

 Federal Financial Assurance  i 

 Tribal Well  i No