Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-17123
Well Classification: OW Status: PA - 2/7/2024
Well Name/No:HAGEN #9-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:61227
Facility Status:PAStatus Date2/7/2024
FacilityID:249321LocationID:329300
County:WELD #123Location:NESE 9 4N64W 6
Field:WATTENBERG - #90750Elevation:4670 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1977FSL  660 FELLat/Long: 40.325056 / -104.548484Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.324470 / -104.549130Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 2/7/2024             Measured TD: 7037 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 2/7/2024
Wellbore PermitDRIFTED
Permit #:930798 Expiration Date:10/20/1993
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: N2SE

Wellbore Completed
Completion Date:7/23/1993
Measured TD:7037 ft.Measured PB depth:6983 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 9.875 in., Size: , Top: 0 ft., Depth: 500 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: 0 ft., Bottom: 500 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7025 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 75, Top: 5884 ft., Bottom: 7025 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3607 ft.
SUSSEX4051 ft.
NIOBRARA6558 ft.
FORT HAYS6844 ft.
CODELL6867 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/19/2020                 Interval Top: 6868 ft.    Interval Bottom: 6878 ft.

 Completed Information for Formation CODELL
1st Production Date:8/6/1993Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/23/1993
Treatment Summary:CODELL UNDER SAND PLUG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6868 ft.# Of Holes:41
Interval Bottom:6878 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 2/7/2024                  Interval Top: 6576 ft.    Interval Bottom: 6878 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/6/1993Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/24/2007
Treatment Summary:COMMINGLE CODELL & NIOBRARA
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 7
BBLS_OIL 11
BTU_GAS 1315
CALC_BBLS_H2O 3
CALC_BBLS_OIL 15
CALC_GOR 6455
CALC_MCF_GAS 75
CASING_PRESS 550
GRAVITY_OIL 56
MCF_GAS 71
TUBING_PRESS 310
Perforation Data:
Interval Top:6576 ft.# Of Holes:263
Interval Bottom:6878 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/19/2020                 Interval Top: 6576 ft.    Interval Bottom: 6686 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/6/1993Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/19/2007
Treatment Summary:RE-FRAC'D NBRR W/70,663 GALS OF SLICKWATER AND 99,609 GALS OF SILVERSTIM WITH 28# GEL LOADING AND 250,880#'S OF 30/50 OTTAWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 20
BTU_GAS 1315
CALC_GOR 7000
CASING_PRESS 180
GRAVITY_OIL 54
MCF_GAS 140
Perforation Data:
Interval Top:6576 ft.# Of Holes:222
Interval Bottom:6686 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/07/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No