|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 10/23/2017 Measured TD: 7921 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 10/23/2017 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20021856 | Expiration Date: | 10/7/2003 | | Proposed Depth/Form: | 7880 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: S2SE | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 |
| | |
| Wellbore Completed | | Completion Date: | 3/6/2003 | | Spud Date: | 5/18/1993 | Spud Date Is: | ACTUAL | | Measured TD: | 7921 ft. | Measured PB depth: | 7889 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CDL/GR/SP/DIFL/CAL/CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 506 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 506 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7433 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6400 ft., Bottom: 7433 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5000 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 375, Top: 3950 ft., Bottom: 5000 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7369 ft., Depth: 7921 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 35, Top: 7369 ft., Bottom: 7921 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3754 ft. | | N | N | | SUSSEX | 4182 ft. | | N | N | | NIOBRARA | 7003 ft. | 7286 ft. | N | N | | FORT HAYS | 7286 ft. | 7306 ft. | N | N | | CODELL | 7306 ft. | 7329 ft. | N | N | | J SAND | 7752 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 10/23/2017 Interval Top: 7754 ft. Interval Bottom: 7814 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/25/2003 | Choke Size: | 0.370 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | PLUNGER 500 | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/6/2003 | | Treatment Summary: | FRAC W/ 280060# 20/40 MESH 120582 GAL SAND LADEN FLUID |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7725 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7754 ft. | # Of Holes: | | | Interval Bottom: | 7814 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: AB - 10/23/2017 Interval Top: 7310 ft. Interval Bottom: 7320 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/10/1993 | Choke Size: | | | Formation Name: | CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/6/2003 | | Treatment Summary: | FRAC W/ 64000 GAL WTR W/ CLAYTREAT W/ 35# GUAR AND 190000# 20/40 MESH SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6917 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/11/1993 | Test Method: | FLOWING | | Hours Tested: | 3 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 27 | | BBLS_OIL | 30 | | CALC_BBLS_H2O | 216 | | CALC_BBLS_OIL | 576 | | CALC_GOR | 2400 | | CALC_MCF_GAS | 576 | | CASING_PRESS | 1000 | | MCF_GAS | 72 | | TUBING_PRESS | 240 |
| | Perforation Data: | | Interval Top: | 7310 ft. | # Of Holes: | 20 | | Interval Bottom: | 7320 ft. | Hole Size: | 0.36 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 5/12/2003 Interval Top: 7310 ft. Interval Bottom: 7814 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.375 in. | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | PLUNGER | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/6/2003 | | Treatment Summary: | COMMINGLED WITH CODELL |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7725 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/12/2003 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 1 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 77000 | | CALC_MCF_GAS | 77 | | CASING_PRESS | 775 | | GRAVITY_OIL | 60 | | MCF_GAS | 77 | | TUBING_PRESS | 760 |
| | Perforation Data: | | Interval Top: | 7310 ft. | # Of Holes: | | | Interval Bottom: | 7814 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/23/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|