|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/31/2023 Measured TD: 7947 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/31/2023 | | Wellbore Permit | DRIFTED | | Permit #: | 20012007 | Expiration Date: | 11/15/2002 | | Proposed Depth/Form: | 8049 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2NW4 |
| | |
| Wellbore Completed | | Completion Date: | 2/16/2002 | | Spud Date: | 5/6/1993 | Spud Date Is: | ACTUAL | | Measured TD: | 7947 ft. | Measured PB depth: | 7935 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL/CDL/GR | | Log Types: | GR - CCL - CBL - SLIM HOLE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 615 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 615 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7426 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 380, Top: 3840 ft., Bottom: 7426 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7368 ft., Depth: 7944 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 35, Top: 7368 ft., Bottom: 7944 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4535 ft. | | N | N | | BENTONITE | 4683 ft. | | N | N | | NIOBRARA | 7033 ft. | | N | N | | FORT HAYS | 7293 ft. | | N | N | | CODELL | 7316 ft. | | N | N | | GREENHORN | 7375 ft. | | N | N | | J-2 SAND | 7780 ft. | | N | N | | SKULL CREEK | 7888 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 3/31/2023 Interval Top: 7780 ft. Interval Bottom: 7820 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/1/2002 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7780 ft. | # Of Holes: | 128 | | Interval Bottom: | 7820 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 12/20/2022 Interval Top: 7318 ft. Interval Bottom: 7332 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/5/1993 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7318 ft. | # Of Holes: | 8 | | Interval Bottom: | 7332 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 12/18/2003 Interval Top: 7055 ft. Interval Bottom: 7820 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 3/18/2002 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/16/2002 | | Treatment Summary: | REL RBP. TIH W/PRODUCTION TBG. LAND EOT @ 7330'. SWAB.*ALSO SEE SCANNED DOCS 01079757 & 01199159 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7330 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/18/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | BBLS_OIL | 13 | | CALC_BBLS_H2O | 13 | | CALC_BBLS_OIL | 13 | | CALC_GOR | 20308 | | CALC_MCF_GAS | 264 | | CASING_PRESS | 660 | | MCF_GAS | 264 | | TUBING_PRESS | 325 |
| | Perforation Data: | | Interval Top: | 7055 ft. | # Of Holes: | 282 | | Interval Bottom: | 7820 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/31/2023 Interval Top: 7055 ft. Interval Bottom: 7332 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/5/1993 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/5/2009 | | Treatment Summary: | NB-CD COMMINGLE. RELEASED RBP @ 7300'. 7/8/09. RELEASED RBP @ 7350' TO COMMINGLE THE NBRR & CODL. 7/9/09 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 7 | | BTU_GAS | 1233 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 7 | | CALC_GOR | 26571 | | CALC_MCF_GAS | 186 | | CASING_PRESS | 574 | | GRAVITY_OIL | 63 | | MCF_GAS | 186 | | TUBING_PRESS | 235 |
| | Perforation Data: | | Interval Top: | 7055 ft. | # Of Holes: | 98 | | Interval Bottom: | 7332 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 12/16/2022 Interval Top: 7055 ft. Interval Bottom: 7250 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/5/1993 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/16/2002 | | Treatment Summary: | SET RBP @ 7290. DUMP BAIL 2 SACKS OF SAND ON TOP. TIH W/TBG, PKR. SET PKR. TOOH W/TBG, PKR. TIH W/TBG, PKR #2. SET PKR @7010. REL PKR. PERFD NBRR FRM 7055-7250 W/2 SPF. PUMPED 40,000 GALS PAD SLICK WATER & 22200 GALS @ 0.5 PPG 20/40(119560#)SAND. FLOW BACK WELL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 30 | | BBLS_OIL | 13 | | CALC_BBLS_H2O | 30 | | CALC_BBLS_OIL | 13 | | CALC_GOR | 22692 | | CALC_MCF_GAS | 295 | | CASING_PRESS | 280 | | MCF_GAS | 295 |
| | Perforation Data: | | Interval Top: | 7055 ft. | # Of Holes: | 90 | | Interval Bottom: | 7250 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/31/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|