Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-16993
Well Classification: GW Status: PA - 9/16/2021
Well Name/No:HSR-BLAISE #3-31
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/16/2021
FacilityID:249191LocationID:336111
County:WELD #123Location:NENW 31 3N65W 6
Field:WATTENBERG - #90750Elevation:4930 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:801FNL  2121 FWLLat/Long: 40.186927 / -104.708268Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.187020 / -104.708070Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 9/16/2021             Measured TD: 7935 ft.    Vertical TD: 7935 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 9/16/2021
Wellbore Permit
Permit #:20040980 Expiration Date:5/20/2005
Proposed Depth/Form:7940 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2NW

Wellbore Completed
Completion Date:9/7/2004
Spud Date:5/7/1993Spud Date Is:ACTUAL
Measured TD:7935 ft.Measured PB depth:7903 ft.
True Vertical TD:7935 ft.True Vertical PB depth:7903 ft.
Log Types:DIL/SFL/GR; CBL; DEN / CNL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 741 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 0 ft., Bottom: 741 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7481 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6230 ft., Bottom: 7481 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5042 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 3606 ft., Bottom: 5042 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7413 ft., Depth: 7935 ft., Weight: 4.7 , Citings Type: ACTUAL
Cement:Sacks: 21, Top: 7413 ft., Bottom: 7935 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4544 ft.NN
NIOBRARA7058 ft.NN
FORT HAYS7319 ft.NN
CODELL7342 ft.NN
J SAND7770 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 9/16/2021                 Interval Top: 7777 ft.    Interval Bottom: 7824 ft.

 Completed Information for Formation J SAND
1st Production Date:10/23/2004Choke Size: 
Formation Name:J SANDCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:9/7/2004
Treatment Summary:JSND 150,858 GAL FLUID; 4,000# 12/20 SAND; 115,480# 30/50 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7757 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7777 ft.# Of Holes:96
Interval Bottom:7824 ft.Hole Size:0.21 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 10/23/2004                Interval Top: 7058 ft.    Interval Bottom: 7824 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:10/23/2004Choke Size:0.344 in.
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:9/7/2004
Treatment Summary:COMMINGLED JSAND W/NB-CD.
Tubing Size:2.375 in.Tubing Setting Depth:7757 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/23/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 4
CALC_BBLS_H2O 0
CALC_BBLS_OIL 4
CALC_GOR 23500
CALC_MCF_GAS 94
CASING_PRESS 665
GRAVITY_OIL 54.2
MCF_GAS 94
TUBING_PRESS 593
Perforation Data:
Interval Top:7058 ft.# Of Holes:140
Interval Bottom:7824 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 9/16/2021                 Interval Top: 7058 ft.    Interval Bottom: 7356 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/14/1993Choke Size:0.188 in.
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:9/7/2004
Treatment Summary:7343-7356' FRAC'D W/350,000# 20/40 MESH SAND + 76,101 GAL GELLED FLUID. 7058-7196' FRAC'D W/228,900# 20/40 MESH SAND + 68,481 GAL GELLED FLUID, JUNE 1993. // REPERF CODL 7344-7354' '7/9/03 REFRAC NB-CD W/118,140# 30/50 MESH; 108,808 GAL GELLED FLUID.
Tubing Size:2.375 in.Tubing Setting Depth:7309 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/29/2003Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 3
CALC_BBLS_OIL 3
CALC_GOR 16000
CALC_MCF_GAS 48
CASING_PRESS 550
GRAVITY_OIL 60
MCF_GAS 48
TUBING_PRESS 350
Perforation Data:
Interval Top:7058 ft.# Of Holes:44
Interval Bottom:7356 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/16/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No