Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-16960
Well Classification: GW Status: PA - 7/31/2025
Well Name/No:PHILLIPS #23-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:59732
Facility Status:PAStatus Date7/31/2025
FacilityID:249158LocationID:329167
Municipality/County:GREELEY / WELD #123Location:SENE 23 5N67W 6
Field:WATTENBERG - #90750Elevation:4976 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1957FNL  658 FELLat/Long: 40.386744 / -104.853394Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.386817 / -104.853313Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 7/31/2025             Measured TD: 7580 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 7/31/2025
Wellbore Permit
Permit #:930441 Expiration Date:7/21/1993
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: E2NE

Wellbore Completed
Completion Date:5/27/1993
Measured TD:7580 ft.Measured PB depth:0 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 400 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 400 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7633 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6711 ft., Bottom: 7633 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7103 ft.
CODELL7455 ft.

Formation CARL                     Formation Classification:  GW                     Status:  CM - 3/24/2025                 Interval Top: 7600 ft.    Interval Bottom: 7601 ft.

 Completed Information for Formation CARLILE
1st Production Date:5/27/1993Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:7600 ft.# Of Holes:4
Interval Bottom:7601 ft.Hole Size:0.32 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/19/2025                 Interval Top: 7456 ft.    Interval Bottom: 7468 ft.

 Completed Information for Formation CODELL
1st Production Date:5/27/1993Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/27/1993
Treatment Summary:REFRACED CODELL W/260,760# 20-40 SD, USING 122,598 GAL 26# AND 24# VISTAR GEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 1
CALC_BBLS_H2O 48
CALC_BBLS_OIL 48
CALC_GOR 21667
CALC_MCF_GAS 1040
CASING_PRESS 680
MCF_GAS 22
TUBING_PRESS 620
Perforation Data:
Interval Top:7456 ft.# Of Holes:80
Interval Bottom:7468 ft.Hole Size:2 in.

Formation CLCDFH                 Formation Classification:  GW                 Status:  AB - 7/31/2025                 Interval Top: 7430 ft.    Interval Bottom: 7601 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:5/27/1993Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CLCDFH.
Perforation Data:
Interval Top:7430 ft.# Of Holes:88
Interval Bottom:7601 ft.Hole Size:

Formation FTHYS                   Formation Classification:  GW                   Status:  CM - 3/24/2025                 Interval Top: 7430 ft.    Interval Bottom: 7431 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:5/27/1993Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7430 ft.# Of Holes:4
Interval Bottom:7431 ft.Hole Size:0.32 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/31/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)18
Total Gas Produced (MCF)569
GOR31611
GOR DeterminationMCFE
Average BOE per Day0.322
Average MCFE per Day1.872

 Federal Financial Assurance  i 

 Tribal Well  i No