|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 7/31/2025 Measured TD: 7580 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/31/2025 | | Wellbore Permit | | | Permit #: | 930441 | Expiration Date: | 7/21/1993 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: E2NE |
| | |
| Wellbore Completed | | Completion Date: | 5/27/1993 | | Measured TD: | 7580 ft. | Measured PB depth: | 0 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 400 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 400 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7633 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6711 ft., Bottom: 7633 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7103 ft. | | | | | CODELL | 7455 ft. | | | |
Formation CARL Formation Classification: GW Status: CM - 3/24/2025 Interval Top: 7600 ft. Interval Bottom: 7601 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | 5/27/1993 | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 7600 ft. | # Of Holes: | 4 | | Interval Bottom: | 7601 ft. | Hole Size: | 0.32 in. |
|
Formation CODL Formation Classification: GW Status: CM - 3/19/2025 Interval Top: 7456 ft. Interval Bottom: 7468 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/27/1993 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/27/1993 | | Treatment Summary: | REFRACED CODELL W/260,760# 20-40 SD, USING 122,598 GAL 26# AND 24# VISTAR GEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 1 | | CALC_BBLS_H2O | 48 | | CALC_BBLS_OIL | 48 | | CALC_GOR | 21667 | | CALC_MCF_GAS | 1040 | | CASING_PRESS | 680 | | MCF_GAS | 22 | | TUBING_PRESS | 620 |
| | Perforation Data: | | Interval Top: | 7456 ft. | # Of Holes: | 80 | | Interval Bottom: | 7468 ft. | Hole Size: | 2 in. |
|
Formation CLCDFH Formation Classification: GW Status: AB - 7/31/2025 Interval Top: 7430 ft. Interval Bottom: 7601 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 5/27/1993 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CLCDFH. |
| | Perforation Data: | | Interval Top: | 7430 ft. | # Of Holes: | 88 | | Interval Bottom: | 7601 ft. | Hole Size: | |
|
Formation FTHYS Formation Classification: GW Status: CM - 3/24/2025 Interval Top: 7430 ft. Interval Bottom: 7431 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | 5/27/1993 | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 7430 ft. | # Of Holes: | 4 | | Interval Bottom: | 7431 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/31/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 33 |
| Total Gas Produced (MCF) | 776 |
| GOR | 23515 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.458 |
| Average MCFE per Day | 2.671 |
| Federal Financial Assurance | i | |
|
|