|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/18/2024 Measured TD: 7289 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/18/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 19930352 | Expiration Date: | 7/24/1993 | | Proposed Depth/Form: | 7200 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBCSX , Formation: NIOBRARA-CODELL-SUSSEX , Order: 407 , Unit Acreage: 40, Drill Unit: SESE |
| | |
| Wellbore Completed | | Completion Date: | 5/16/1993 | | Spud Date: | 3/27/1993 | Spud Date Is: | ACTUAL | | Measured TD: | 7289 ft. | Measured PB depth: | 7251 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL/FDC/CBL-GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 547 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 0 ft., Bottom: 547 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7287 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 6500 ft., Bottom: 7287 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: 0 ft., Depth: 4770 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 120, Top: 3760 ft., Bottom: 4770 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 400 ft. | 480 ft. | N | N | | SUSSEX | 4405 ft. | 4503 ft. | N | N | | BENTONITE | 4528 ft. | | N | N | | NIOBRARA | 6873 ft. | 7132 ft. | N | N | | FORT HAYS | 7132 ft. | | N | N | | CODELL | 7155 ft. | 7216 ft. | N | N | | GREENHORN | 7216 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 9/13/2023 Interval Top: 7155 ft. Interval Bottom: 7170 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 9/13/2023 | Treatment End Date: | N/A | | Treatment Summary: | 5/13/1993 perf 7158, 7160, 7162, 7164, 7166 5 holes;
11/6/2001 perf 7155 - 7170 30 holes;
5/31/2009 perf 7158 - 7166 32 holes. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7155 ft. | # Of Holes: | 67 | | Interval Bottom: | 7170 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/18/2024 Interval Top: 6910 ft. Interval Bottom: 7170 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/8/2009 | | Treatment Summary: | RELEASED RBP @ 7110' TO COMMINGLE THE NB-CD. 6/30/09 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 9 | | BTU_GAS | 1414 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 9 | | CALC_GOR | 24111 | | CALC_MCF_GAS | 217 | | CASING_PRESS | 318 | | GRAVITY_OIL | 59 | | MCF_GAS | 217 | | TUBING_PRESS | 212 |
| | Perforation Data: | | Interval Top: | 6910 ft. | # Of Holes: | 406 | | Interval Bottom: | 7170 ft. | Hole Size: | 0.41 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 9/13/2023 Interval Top: 6910 ft. Interval Bottom: 7090 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 9/13/2023 | Treatment End Date: | N/A | | Treatment Summary: | 5/13/1993 perf 6942, 6944, 6946 3 holes;
1/5/2004 perf 6910 - 6950, 7046 - 7090 168 holes;
5/31/2009 perf 6910 - 6950, 6942 - 6946, 7046 - 7090 168 holes | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6910 ft. | # Of Holes: | 339 | | Interval Bottom: | 7090 ft. | Hole Size: | 0.41 in. |
|
Formation SUSX Formation Classification: GW Status: AB - 6/9/2023 Interval Top: 4492 ft. Interval Bottom: 4502 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | SUSSEX | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/16/1993 | | Treatment Summary: | 9/1993:FRAC W/270,000# 20/40 SAND & 17,000# RESIN COATED 20/40 SAND IN 57,823 GALS PUR-GEL FL. // 11/2001:SET RBP @ 4594' AND PKR @ 4563'. PRESSURE TEST RBP. POOH W/ PKR. LAND TBG @ 4514'. SQUEEZE SUSSEX W/ 25 SXS CM. DRILL OUT CMT. REMOVE BP & PKR. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 40 | | BBLS_OIL | 12 | | CALC_BBLS_H2O | 40 | | CALC_BBLS_OIL | 12 | | CALC_GOR | 18750 | | CALC_MCF_GAS | 225 | | CASING_PRESS | 650 | | MCF_GAS | 225 | | TUBING_PRESS | 400 |
| | Perforation Data: | | Interval Top: | 4492 ft. | # Of Holes: | 20 | | Interval Bottom: | 4502 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/18/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|