Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-16912
Well Classification: GW Status: PA - 4/18/2024
Well Name/No:FEDERAL 2-4 BATTERY #43-4C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/18/2024
FacilityID:249110LocationID:311323
County:WELD #123Location:NESE 4 3N65W 6
Field:ARISTOCRAT - #2925Elevation:4805 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2110FSL  660 FELLat/Long: 40.252897 / -104.661107Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.252672 / -104.661194Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 4/18/2024             Measured TD: 7259 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 4/18/2024
Wellbore PermitDIRECTIONAL
Permit #:19930312 Expiration Date:7/17/1993
Proposed Depth/Form:7250 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 40, Drill Unit: NESE

Wellbore Completed
Completion Date:N/A
Spud Date:3/23/1993Spud Date Is:ACTUAL
Measured TD:7259 ft.Measured PB depth:7230 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL/FDC/CNL-GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 531 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 531 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7241 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 268, Top: 6576 ft., Bottom: 7259 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4900 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 141, Top: 4200 ft., Bottom: 4900 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS400 ft.480 ft.NN
SUSSEX4370 ft.4500 ft.NN
NIOBRARA6878 ft.7125 ft.NN
FORT HAYS7125 ft.7148 ft.NN
CODELL7148 ft.7166 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 9/12/2023                 Interval Top: 7148 ft.    Interval Bottom: 7164 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/12/2023Treatment End Date:N/A
Treatment Summary:4/14/1993 perf 7152 - 7160 5 holes; April 2001 perf 7148 - 7164 32 holes; 6/11/2009 7148 - 7160 37 holes
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7148 ft.# Of Holes:74
Interval Bottom:7164 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 4/18/2024                 Interval Top: 6900 ft.    Interval Bottom: 7164 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/15/2009
Treatment Summary:NBRR-CDL COMMINGLE. RELEASED RBP @7130' TO COMMINGLE THE NBRR-CDL 7/9/09
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 4
BTU_GAS 1311
CALC_BBLS_H2O 10
CALC_BBLS_OIL 4
CALC_GOR 49500
CALC_MCF_GAS 198
CASING_PRESS 540
GRAVITY_OIL 59
MCF_GAS 198
TUBING_PRESS 283
Perforation Data:
Interval Top:6900 ft.# Of Holes:325
Interval Bottom:7164 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 6/9/2023                  Interval Top: 6900 ft.    Interval Bottom: 7080 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/12/2023Treatment End Date:N/A
Treatment Summary:4/14/1993 perf 6948 - 6952 3 holes; 1/27/2004 perf 6900- 6930, 7030 - 7050 120 holes; 6/16/2009 6900 - 6930, 6948 - 6952, 7050 - 7080 128 holes
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:5/14/1993
Treatment Summary:FRAC W/ 404,280# 20/40 SAND IN 89,112 GALS OF X-LINKED PUR-GEL FLUID.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 85
BBLS_OIL 40
CALC_BBLS_H2O 85
CALC_BBLS_OIL 40
CALC_GOR 9000
CALC_MCF_GAS 360
CASING_PRESS 2100
MCF_GAS 360
TUBING_PRESS 2000
Perforation Data:
Interval Top:6900 ft.# Of Holes:251
Interval Bottom:7080 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/18/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No