Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-16893
Well Classification: OW Status: PA - 2/4/2021
Well Name/No:KATE WHITE #D 29-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/4/2021
FacilityID:249091LocationID:329121
County:WELD #123Location:SESE 29 3N64W 6
Field:WATTENBERG - #90750Elevation:4810 ft.
Planned Location:660FSL  660 FELLat/Long: 40.190818 / -104.567903Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.190830 / -104.568080Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 2/4/2021             Measured TD: 7156 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 2/4/2021
Wellbore PermitDRIFTED
Permit #:19930282 Expiration Date:3/19/1994
Proposed Depth/Form:7175 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2SE
Formation And Spacing:Code: SUSX , Formation: SUSSEX , Order: 493-2 , Unit Acreage: 80, Drill Unit: E2SE

Wellbore Completed
Completion Date:6/10/1993
Spud Date:4/21/1993Spud Date Is:ACTUAL
Measured TD:7156 ft.Measured PB depth:7127 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Log Types:CD, DIL, CBL/CCL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 570 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 570 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7171 ft., Weight: 11.60 , Citings Type: ACTUAL
Cement:Sacks: 720, Top: 3700 ft., Bottom: 7171 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4322 ft.
NIOBRARA6732 ft.
CODELL7013 ft.

Formation CODL                     Formation Classification:  OG                     Status:  CM - 12/21/2020                Interval Top: 7014 ft.    Interval Bottom: 7028 ft.

 Completed Information for Formation CODELL
1st Production Date:6/10/1993Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/13/2006
Treatment Summary:RE-FRAC'D CODELL W/126,924 GALS OF VISTAR WITH 22# GEL LOADINGS AND 246,200#'S OF 20/40 OTTAWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 10
CALC_GOR 3000
CASING_PRESS 1050
MCF_GAS 30
TUBING_PRESS 1000
Perforation Data:
Interval Top:7014 ft.# Of Holes:104
Interval Bottom:7028 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OG                   Status:  AB - 2/4/2021                  Interval Top: 6706 ft.    Interval Bottom: 7028 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/4/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/10/1993
Treatment Summary:COMMINGLE NIOBRARA & CODELL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 22
BTU_GAS 1345
CALC_GOR 7636
CASING_PRESS 660
GRAVITY_OIL 55
MCF_GAS 168
TUBING_PRESS 240
Perforation Data:
Interval Top:6706 ft.# Of Holes:232
Interval Bottom:7028 ft.Hole Size:

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 12/21/2020                Interval Top: 6706 ft.    Interval Bottom: 6790 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/4/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/3/2008
Treatment Summary:FRAC'D NBRR W/183,456 GALS OF VISTAR & SLICKWATER W/ 252,720# OTTAWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6706 ft.# Of Holes:128
Interval Bottom:6790 ft.Hole Size:0.41 in.

Formation SUSX                     Formation Classification:  OG                     Status:  AB - 2/4/2021                  Interval Top: 4397 ft.    Interval Bottom: 4436 ft.

 Completed Information for Formation SUSSEX
1st Production Date:9/1/1994Choke Size: 
Formation Name:SUSSEXCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/10/1993
Treatment Summary:2,174 BW & 219,760# 20/40 & 22,140# 12/20 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 7
CALC_GOR 4571
CASING_PRESS 975
MCF_GAS 32
TUBING_PRESS 450
Perforation Data:
Interval Top:4397 ft.# Of Holes:14
Interval Bottom:4436 ft.Hole Size:0.32 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/04/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No