Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-16827
Well Classification: OW Status: SI - 7/1/2025
Well Name/No:LORENZ L #30-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2025
FacilityID:249025LocationID:329069
County:WELD #123Location:SESW 30 3N66W 6
Field:WATTENBERG - #90750Elevation:4825 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:510FSL  2130 FWLLat/Long: 40.189707 / -104.822211Lat/Long Source: Calculated From Footages
As Drilled Location:656 FSL  2121 FWLLat/Long: 40.190100 / -104.822290Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/22/2012
End Date: 2/22/2012
Reported: 3/8/2012
Prior to rule 205A.b.(2)(A)
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 7/1/2025             Measured TD: 7469 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 7/1/2025
Wellbore Permit
Permit #:19930200 Expiration Date:6/25/1993
Proposed Depth/Form:7500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SW4

Wellbore Completed
Completion Date:3/5/1993
Spud Date:2/26/1993Spud Date Is:ACTUAL
Measured TD:7469 ft.Measured PB depth:7442 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 0 FL  0 FL
Log Types:COMP.DENSITY, DIL, CBL-CCL-GR
Log Types:Gamma Ray CCL/CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 423 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 0 ft., Bottom: 423 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 2.875 in., Top: 0 ft., Depth: 7445 ft., Weight: 7.9 , Citings Type: ACTUAL
Cement:Sacks: 210, Top: 6476 ft., Bottom: 7445 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 2.875 in., Top: , Depth: 4762 ft., Weight: 7.9 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 1870 ft., Bottom: 4780 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 2.875 in., Top: , Depth: 670 ft., Weight: 7.9 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 670 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4244 ft.NN
NIOBRARA7039 ft.NN
CODELL7302 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/15/2025                 Interval Top: 7304 ft.    Interval Bottom: 7320 ft.

 Completed Information for Formation CODELL
1st Production Date:4/21/1993Choke Size: 
Formation Name:CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:8/13/2013Treatment End Date:N/A
Treatment Summary:COMMINGLE W/NBBR
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/21/1993
Treatment Summary:7306-7316' 70,860 GALS YF540/25 HT W/200,000# 20/40 SAND, 1993. // REFRAC:132,216 GAL VISTAR 28# GEL & 245,500# 20/40 OTTAWA SAND, 8/29/03
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 43
BTU_GAS 1216
CALC_BBLS_H2O 4
CALC_BBLS_OIL 43
CALC_GOR 2884
CALC_MCF_GAS 124
CASING_PRESS 150
GRAVITY_OIL 50.6
MCF_GAS 124
Perforation Data:
Interval Top:7304 ft.# Of Holes:64
Interval Bottom:7320 ft.Hole Size:0.22 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/15/2025                 Interval Top: 7085 ft.    Interval Bottom: 7320 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/9/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/16/2012
Treatment Summary:COMMINGLE NB & CD
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 4
BTU_GAS 1198
CALC_BBLS_H2O 10
CALC_BBLS_OIL 4
CALC_GOR 14000
CALC_MCF_GAS 56
CASING_PRESS 904
GRAVITY_OIL 51
MCF_GAS 56
TUBING_PRESS 442
Perforation Data:
Interval Top:7085 ft.# Of Holes:232
Interval Bottom:7320 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/23/2025                 Interval Top: 7085 ft.    Interval Bottom: 7186 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/9/2012Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/22/2012
Treatment Summary:PERF'D 7085-7101 AND 7170-7186, FRAC'D W/158881 GAL VISTAR AND SLICK WATER, 850 GAL 15% HCI AND 221989# OTTAWA SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7085 ft.# Of Holes:128
Interval Bottom:7186 ft.Hole Size:0.2 in.
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedY10/30/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)2
Total Gas Produced (MCF)948
GOR474000
GOR DeterminationMCFE
Average BOE per Day0.456
Average MCFE per Day2.635

 Federal Financial Assurance  i 

 Tribal Well  i No