|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/8/2022 Measured TD: 7798 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/8/2022 | | Wellbore Permit | | | Permit #: | 20012089 | Expiration Date: | 11/29/2002 | | Proposed Depth/Form: | 8000 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2SE | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: 320,316 , Unit Acreage: 80, Drill Unit: S2SE |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 3/8/1993 | Spud Date Is: | ACTUAL | | Measured TD: | 7798 ft. | Measured PB depth: | 7778 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, GR | | Log Types: | | | Log Types: | COMP DENSITY, DIL, CBL-CCL-GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 794 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 794 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7341 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 240, Top: 6136 ft., Bottom: 7341 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1510 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 390, Top: 24 ft., Bottom: 1530 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 4.5 in., Size: 2.875 in., Top: 7050 ft., Depth: 7786 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 16, Top: 7083 ft., Bottom: 7786 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4371 ft. | | | | | NIOBRARA | 6828 ft. | | N | N | | CODELL | 7170 ft. | | N | N | | J SAND | 7627 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 9/8/2022 Interval Top: 7628 ft. Interval Bottom: 7675 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/29/2002 | Choke Size: | 0.375 in. | | Formation Name: | J SAND | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/27/1993 | | Treatment Summary: | 118,020 GALS & 300,000# 20/40 |
| | Tubing Size: | 1.5 in. | Tubing Setting Depth: | 7616 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/7/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 30 | | CALC_GOR | 7766.67 | | CASING_PRESS | 400 | | MCF_GAS | 233 | | TUBING_PRESS | 130 |
| | Perforation Data: | | Interval Top: | 7628 ft. | # Of Holes: | 55 | | Interval Bottom: | 7675 ft. | Hole Size: | 0.34 in. |
|
Formation CODL Formation Classification: OW Status: AB - 9/8/2022 Interval Top: 7173 ft. Interval Bottom: 7183 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/27/1993 | Choke Size: | 0.188 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/27/1993 | | Treatment Summary: | 63,112 GALS TERRA FRAC WITH 171,000# 20/40 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/2/1993 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 20 | | CALC_GOR | 3500 | | CASING_PRESS | 800 | | MCF_GAS | 70 | | TUBING_PRESS | 750 |
| | Perforation Data: | | Interval Top: | 7173 ft. | # Of Holes: | 41 | | Interval Bottom: | 7183 ft. | Hole Size: | 0.32 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 4/23/2004 Interval Top: 7173 ft. Interval Bottom: 7675 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.594 in. | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/27/1993 | | Treatment Summary: | PERF CODELL 7173-7185 (48 HOLES). COMMINGLE WITH THE J SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7030 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/23/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 7 | | BBLS_OIL | 5 | | BTU_GAS | 1135 | | CALC_BBLS_H2O | 7 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 22000 | | CALC_MCF_GAS | 110 | | CASING_PRESS | 370 | | GRAVITY_OIL | 46 | | MCF_GAS | 110 | | TUBING_PRESS | 330 |
| | Perforation Data: | | Interval Top: | 7173 ft. | # Of Holes: | 103 | | Interval Bottom: | 7675 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/08/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|