|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 10/20/2020 Measured TD: 8091 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 10/20/2020 | | Wellbore Permit | DRIFTED | | Permit #: | 19921945 | Expiration Date: | 10/6/2000 | | Proposed Depth/Form: | 8091 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-466 , Unit Acreage: 160, Drill Unit: SW4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2 |
| | |
| Wellbore Completed | | Completion Date: | 2/16/1993 | | Spud Date: | 12/29/1992 | Spud Date Is: | ACTUAL | | Measured TD: | 8091 ft. | Measured PB depth: | 8008 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL,SFL,SP, & LDT,CNL,GR,CAL,CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 505 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 0 ft., Bottom: 505 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8083 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 310, Top: 6750 ft., Bottom: 8083 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 455 ft. | | N | N | | SUSSEX | 4432 ft. | | N | N | | NIOBRARA | 7120 ft. | | N | N | | FORT HAYS | 7380 ft. | | N | N | | CODELL | 7400 ft. | | N | N | | GREENHORN | 7460 ft. | | N | N | | MOWRY | 7810 ft. | | N | N | | J SAND | 7844 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 10/20/2020 Interval Top: 7846 ft. Interval Bottom: 7894 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/25/1993 | Choke Size: | 0.250 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/16/1993 | | Treatment Summary: | FRAC'D W/590,000# 20/40 SAND IN 188,300 GALS OF X-LINKED PUR-GEL FLUID. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/26/1993 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 131 | | BBLS_OIL | 10 | | CALC_BBLS_H2O | 131 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 139500 | | CALC_MCF_GAS | 1395 | | CASING_PRESS | 1190 | | MCF_GAS | 1395 |
| | Perforation Data: | | Interval Top: | 7846 ft. | # Of Holes: | 66 | | Interval Bottom: | 7894 ft. | Hole Size: | 0.375 in. |
|
Formation CODL Formation Classification: GW Status: CM - 5/1/2004 Interval Top: 7404 ft. Interval Bottom: 7420 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/30/1999 | Choke Size: | 0.375 in. | | Formation Name: | CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/16/1993 | | Treatment Summary: | FRAC WELL W/202,500# 20/40 FRAC SAND IN 100,828 GALS VISTAR 22 LHT. 1 PPG THRU 4 PPG. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/28/1999 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 9 | | BBLS_OIL | 27 | | CALC_BBLS_H2O | 9 | | CALC_BBLS_OIL | 27 | | CALC_GOR | 6852 | | CALC_MCF_GAS | 185 | | CASING_PRESS | 220 | | MCF_GAS | 185 |
| | Perforation Data: | | Interval Top: | 7404 ft. | # Of Holes: | 32 | | Interval Bottom: | 7420 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 5/1/2004 Interval Top: 7404 ft. Interval Bottom: 7894 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 1/11/2000 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | | | Production Method: | PLUNGER | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/16/1993 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7813 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/9/2000 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 12 | | BBLS_OIL | 22 | | CALC_BBLS_H2O | 12 | | CALC_BBLS_OIL | 22 | | CALC_GOR | 21818 | | CALC_MCF_GAS | 480 | | CASING_PRESS | 330 | | MCF_GAS | 480 | | TUBING_PRESS | 250 |
| | Perforation Data: | | Interval Top: | 7404 ft. | # Of Holes: | 98 | | Interval Bottom: | 7894 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/1/2004 Interval Top: 7130 ft. Interval Bottom: 7894 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.219 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/16/1993 | | Treatment Summary: | JSND-NBRR-CODL COMMINGLE. SET CBP @ 6890'. 04/28/04 DRILLED OUT CBP @ 6890' AND CFP @ 7370' ON 4-30-04 TO COMMINGLE THE JSND-NIOBRARA-CODELL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7818 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/1/2004 | Test Method: | FLOWING | | Hours Tested: | 19 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 20 | | CALC_GOR | 7750 | | CASING_PRESS | 560 | | MCF_GAS | 155 | | TUBING_PRESS | 255 |
| | Perforation Data: | | Interval Top: | 7130 ft. | # Of Holes: | 218 | | Interval Bottom: | 7894 ft. | Hole Size: | 0.48 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/20/2020 Interval Top: 7130 ft. Interval Bottom: 7240 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/16/1993 | | Treatment Summary: | NB-CD RECOMPLETION: SET CFP@7370'. 04-12-04 FRAC'D NBRR 7130'-7320' W/139,600 GAL FRAC FLUID & 200,780 SAND. 04-14-04 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/21/2004 | Test Method: | FLOWING | | Hours Tested: | 15.1 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 15 | | CALC_GOR | 9000 | | CASING_PRESS | 290 | | MCF_GAS | 135 |
| | Perforation Data: | | Interval Top: | 7130 ft. | # Of Holes: | 152 | | Interval Bottom: | 7240 ft. | Hole Size: | 0.48 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/20/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|