Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-16645
Well Classification: GW Status: PA - 10/20/2020
Well Name/No:BARCLAY-CHRISMAN #4-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/20/2020
FacilityID:248843LocationID:328937
County:WELD #123Location:NWSW 20 3N66W 6
Field:WATTENBERG - #90750Elevation:4912 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1630FSL  990 FWLLat/Long: 40.207486 / -104.807041Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.207520 / -104.807295Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 10/20/2020             Measured TD: 8091 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 10/20/2020
Wellbore PermitDRIFTED
Permit #:19921945 Expiration Date:10/6/2000
Proposed Depth/Form:8091 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-466 , Unit Acreage: 160, Drill Unit: SW4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:2/16/1993
Spud Date:12/29/1992Spud Date Is:ACTUAL
Measured TD:8091 ft.Measured PB depth:8008 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL,SFL,SP, & LDT,CNL,GR,CAL,CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 505 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 0 ft., Bottom: 505 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8083 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 6750 ft., Bottom: 8083 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS455 ft.NN
SUSSEX4432 ft.NN
NIOBRARA7120 ft.NN
FORT HAYS7380 ft.NN
CODELL7400 ft.NN
GREENHORN7460 ft.NN
MOWRY7810 ft.NN
J SAND7844 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 10/20/2020                Interval Top: 7846 ft.    Interval Bottom: 7894 ft.

 Completed Information for Formation J SAND
1st Production Date:2/25/1993Choke Size:0.250 in.
Formation Name:J SANDCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:2/16/1993
Treatment Summary:FRAC'D W/590,000# 20/40 SAND IN 188,300 GALS OF X-LINKED PUR-GEL FLUID.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/26/1993Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 131
BBLS_OIL 10
CALC_BBLS_H2O 131
CALC_BBLS_OIL 10
CALC_GOR 139500
CALC_MCF_GAS 1395
CASING_PRESS 1190
MCF_GAS 1395
Perforation Data:
Interval Top:7846 ft.# Of Holes:66
Interval Bottom:7894 ft.Hole Size:0.375 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/1/2004                  Interval Top: 7404 ft.    Interval Bottom: 7420 ft.

 Completed Information for Formation CODELL
1st Production Date:10/30/1999Choke Size:0.375 in.
Formation Name:CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:2/16/1993
Treatment Summary:FRAC WELL W/202,500# 20/40 FRAC SAND IN 100,828 GALS VISTAR 22 LHT. 1 PPG THRU 4 PPG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/28/1999Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 9
BBLS_OIL 27
CALC_BBLS_H2O 9
CALC_BBLS_OIL 27
CALC_GOR 6852
CALC_MCF_GAS 185
CASING_PRESS 220
MCF_GAS 185
Perforation Data:
Interval Top:7404 ft.# Of Holes:32
Interval Bottom:7420 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 5/1/2004                  Interval Top: 7404 ft.    Interval Bottom: 7894 ft.

 Completed Information for Formation J-CODELL
1st Production Date:1/11/2000Choke Size: 
Formation Name:J-CODELLCommingled:
Production Method:PLUNGER
Open Hole Completion:
Formation Treatment
Treatment Date:2/16/1993
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7813 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/9/2000Test Method:PLUNGER
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 22
CALC_BBLS_H2O 12
CALC_BBLS_OIL 22
CALC_GOR 21818
CALC_MCF_GAS 480
CASING_PRESS 330
MCF_GAS 480
TUBING_PRESS 250
Perforation Data:
Interval Top:7404 ft.# Of Holes:98
Interval Bottom:7894 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 5/1/2004                  Interval Top: 7130 ft.    Interval Bottom: 7894 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:2/16/1993
Treatment Summary:JSND-NBRR-CODL COMMINGLE. SET CBP @ 6890'. 04/28/04 DRILLED OUT CBP @ 6890' AND CFP @ 7370' ON 4-30-04 TO COMMINGLE THE JSND-NIOBRARA-CODELL.
Tubing Size:2.375 in.Tubing Setting Depth:7818 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/1/2004Test Method:FLOWING
Hours Tested:19Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 20
CALC_GOR 7750
CASING_PRESS 560
MCF_GAS 155
TUBING_PRESS 255
Perforation Data:
Interval Top:7130 ft.# Of Holes:218
Interval Bottom:7894 ft.Hole Size:0.48 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 10/20/2020                Interval Top: 7130 ft.    Interval Bottom: 7240 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:2/16/1993
Treatment Summary:NB-CD RECOMPLETION: SET CFP@7370'. 04-12-04 FRAC'D NBRR 7130'-7320' W/139,600 GAL FRAC FLUID & 200,780 SAND. 04-14-04
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/21/2004Test Method:FLOWING
Hours Tested:15.1Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 15
CALC_GOR 9000
CASING_PRESS 290
MCF_GAS 135
Perforation Data:
Interval Top:7130 ft.# Of Holes:152
Interval Bottom:7240 ft.Hole Size:0.48 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/20/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No