Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-16642
Well Classification: GW Status: SI - 2/1/2022
Well Name/No:OSTER #31-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:59690
Facility Status:SIStatus Date2/1/2022
FacilityID:248840LocationID:328934
County:WELD #123Location:NWNE 28 4N65W 6
Field:WATTENBERG - #90750Elevation:4827 ft.
Planned Location:798FNL  2136 FELLat/Long: 40.288346 / -104.666497Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.288464 / -104.666626Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 2/1/2022             Measured TD: 7354 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 2/1/2022
Wellbore PermitDRIFTED
Permit #:921939 Expiration Date:4/22/1993
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: W2NE

Wellbore Completed
Completion Date:N/A
Measured TD:7354 ft.Measured PB depth:0 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 523 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 300, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7336 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
FOX HILLS465 ft.
SUSSEX4410 ft.
NIOBRARA6930 ft.
FORT HAYS7192 ft.
CODELL7215 ft.
GREENHORN7275 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 1/1/2020                  Interval Top: 7216 ft.    Interval Bottom: 7230 ft.

 Completed Information for Formation CODELL
1st Production Date:4/16/1993Choke Size:0.375 in.
Formation Name:CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/16/1993
Treatment Summary:REFRAC CODELL WITH 135576 GALS 22# & 20# VISTAR CONTAINING 250540# 20/40 SAND 1 PPG THRU 4 PGG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/25/2001Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 14
CALC_BBLS_H2O 6
CALC_BBLS_OIL 14
CALC_GOR 21786
CALC_MCF_GAS 305
CASING_PRESS 160
MCF_GAS 305
Perforation Data:
Interval Top:7216 ft.# Of Holes:15
Interval Bottom:7230 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 2/1/2022                  Interval Top: 6950 ft.    Interval Bottom: 7230 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/14/2004Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/14/2004
Treatment Summary:NIOBRARA-CODELL RECOMPLETION FRAC'D THE CODELL 7216'-7230' W/285,960# 20/40 SAND IN 65,000 GALS X-LINKED PUR-GEL FLUID. 04-93 FRAC'D THE CODELL 7216'-7230' W/135,576 GALS 22#&20# VISTAR CONTAINING 250,540# 20/40 SAND. 12-23-00 SET CFP@7189' ON 3-20-04
Tubing Size:2.375 in.Tubing Setting Depth:7196 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/14/2004Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 12
CALC_BBLS_H2O 8
CALC_BBLS_OIL 12
CALC_GOR 13750
CALC_MCF_GAS 165
CASING_PRESS 490
MCF_GAS 165
TUBING_PRESS 110
Perforation Data:
Interval Top:6950 ft.# Of Holes:297
Interval Bottom:7230 ft.Hole Size:0.33 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
08/31/2021
Low ProducingYProduction Period
12/2023 - 11/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No