|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 12/2/2015 Measured TD: 8815 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 12/2/2015 | | Wellbore Permit | | | Permit #: | 19921935 | Expiration Date: | 4/22/1993 | | Proposed Depth/Form: | 8850 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: W2NW |
| | |
| Wellbore Completed | | Completion Date: | 3/8/1993 | | Spud Date: | 12/27/1992 | Spud Date Is: | ACTUAL | | Measured TD: | 8815 ft. | Measured PB depth: | 7155 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIFL/SFL/GR; CBL/DEN/CNL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 565 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 565 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7245 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 650, Top: 3670 ft., Bottom: 7245 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4140 ft. | | N | N | | SHANNON | 4550 ft. | | N | N | | NIOBRARA | 6789 ft. | | N | N | | FORT HAYS | 7040 ft. | | N | N | | CODELL | 7062 ft. | | N | N | | GREENHORN | 7144 ft. | | N | N | | BENTONITE | 7328 ft. | | N | N | | J SAND | 7495 ft. | | N | N | | SKULL CREEK | 7635 ft. | | N | N | | M SAND | 7717 ft. | | N | N | | MORRISON | 7812 ft. | | N | N | | LYONS | 8700 ft. | | N | N |
Formation NB-CD Formation Classification: GW Status: AB - 12/2/2015 Interval Top: 7081 ft. Interval Bottom: 63789 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/8/1993 | Choke Size: | 1,264.000 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/8/1993 | | Treatment Summary: | FRAC W/ 578000# 20/40 MESH SAND PLUS 138658 GAL GELLED FLUID |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/16/1993 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 65 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 65 | | CALC_MCF_GAS | 146 | | CASING_PRESS | 2300 | | GRAVITY_OIL | 60 | | MCF_GAS | 146 | | TUBING_PRESS | 1700 |
| | Perforation Data: | | Interval Top: | 7081 ft. | # Of Holes: | 50 | | Interval Bottom: | 63789 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/02/2015 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|