Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-16602
Well Classification: GW Status: PA - 6/30/2023
Well Name/No:ARISTOCRAT ANGUS #41-4C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/30/2023
FacilityID:248800LocationID:328905
County:WELD #123Location:NENE 4 3N65W 6
Field:ARISTOCRAT - #2925Elevation:4802 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:628FNL  860 FELLat/Long: 40.259936 / -104.661847Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.259278 / -104.661049Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 6/30/2023             Measured TD: 7278 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 6/30/2023
Wellbore PermitDIRECTIONAL
Permit #:19921866 Expiration Date:4/9/1993
Proposed Depth/Form:7260 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: E2NE

Wellbore Completed
Completion Date:4/25/1993
Spud Date:12/18/1992Spud Date Is:ACTUAL
Measured TD:7278 ft.Measured PB depth:7197 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIF/CDL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 601 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 601 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7279 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 390, Top: 6518 ft., Bottom: 7279 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: 0 ft., Depth: 4872 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 0, Top: 3998 ft., Bottom: 4872 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4378 ft.NN
NIOBRARA6864 ft.NN
FORT HAYS7121 ft.NN
CODELL7143 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/24/2023                 Interval Top: 7144 ft.    Interval Bottom: 7160 ft.

 Completed Information for Formation CODELL
1st Production Date:4/25/1993Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7144 ft.# Of Holes:40
Interval Bottom:7160 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 6/30/2023                 Interval Top: 6837 ft.    Interval Bottom: 7160 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/25/1993Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/15/2009
Treatment Summary:NBRR-CODL COMMINGLE. RELEASED RBP @ 7100' TO COMMINGLE THE NBRR & CODL. 6/19/09
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 17
BBLS_OIL 1
BTU_GAS 1287
CALC_BBLS_H2O 11
CALC_BBLS_OIL 1
CALC_GOR 189000
CALC_MCF_GAS 189
CASING_PRESS 362
GRAVITY_OIL 58
MCF_GAS 189
TUBING_PRESS 132
Perforation Data:
Interval Top:6837 ft.# Of Holes:160
Interval Bottom:7160 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/21/2023                 Interval Top: 6837 ft.    Interval Bottom: 7070 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/25/1993Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/25/1993
Treatment Summary:6837-7154' FRAC W/406,800# 20/40 SAND IN 89,509 GALS X-LINKED PUR-GEL FLUID.(4/93) SET CIBP @ 7130. DUMP 1 SX CMT ON PLUG. TIH W/PKR, TBG. SET PKR. REL PKR. PERF'D THE NBRR FROM 6880-6910, 7040-7070 W/2 SPF. FRAC'D NBRR W/138,512 GAL FRAC FLUID AND 200,080 SAND. FLOW BACK FRAC. (2/2004)
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 15
CALC_BBLS_H2O 15
CALC_BBLS_OIL 15
CALC_GOR 16667
CALC_MCF_GAS 250
MCF_GAS 250
TUBING_PRESS 205
Perforation Data:
Interval Top:6837 ft.# Of Holes:120
Interval Bottom:7070 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/30/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No