Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-16351
Well Classification: GW Status: PA - 2/9/2018
Well Name/No:ARISTOCRAT ANGUS #21-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/9/2018
FacilityID:248553LocationID:332681
County:WELD #123Location:NENW 3 3N65W 6
Field:WATTENBERG - #90750Elevation:4780 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:800FNL  2110 FWLLat/Long: 40.259427 / -104.651197Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.259050 / -104.651180Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 2/9/2018             Measured TD: 7230 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 2/9/2018
Wellbore PermitDRIFTED
Permit #:19921438 Expiration Date:9/15/1994
Proposed Depth/Form:7230 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2NW
Formation And Spacing:Code: SUSX , Formation: SUSSEX , Order: 493-2 , Unit Acreage: 80, Drill Unit: W2NW

Wellbore Completed
Completion Date:3/16/1993
Spud Date:11/12/1992Spud Date Is:ACTUAL
Measured TD:7230 ft.Measured PB depth:7179 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL,CDL,CNL.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 506 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 506 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7230 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 338, Top: 6234 ft., Bottom: 7230 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4400 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 4430 ft., Bottom: 5200 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4400 ft.NN
NIOBRARA6864 ft.NN
FORT HAYS7124 ft.NN
CODELL7148 ft.NN

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 2/9/2018                  Interval Top: 6830 ft.    Interval Bottom: 7103 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/16/1993
Treatment Summary:RE-FRAC'D THE CODELL WITH 250,100# 20/40 SAND IN 80,556 GALS VISTAR 28 XLF. STAGED SAND FROM 1# TO 5#. TOTAL GELLED FLUID - 118,020 GALS. 11/03/09 TOTAL FRAC FLUID - 119,532 GALS. 11-03-09 SET CBP @ 7055'. 11-04-09 RE-FRAC'D THE NIOBRARA WITH 250,160#
Tubing Size:2.375 in.Tubing Setting Depth:7052 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/26/2009Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 13
CALC_BBLS_H2O 14
CALC_BBLS_OIL 13
CALC_GOR 11769
CALC_MCF_GAS 296
CASING_PRESS 550
MCF_GAS 296
TUBING_PRESS 375
Perforation Data:
Interval Top:6830 ft.# Of Holes:150
Interval Bottom:7103 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 1/18/2004                 Interval Top: 6830 ft.    Interval Bottom: 7010 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/16/1993Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:3/16/1993
Treatment Summary:SEE SCANNED DOCUMENTS:00636995; 01265326; 01339134 & 01160698
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/18/2004Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 11
BBLS_OIL 7
CALC_BBLS_H2O 11
CALC_BBLS_OIL 7
CALC_GOR 32000
CALC_MCF_GAS 224
CASING_PRESS 90
MCF_GAS 224
Perforation Data:
Interval Top:6830 ft.# Of Holes:120
Interval Bottom:7010 ft.Hole Size:0.38 in.

Formation SUSX                     Formation Classification:  GW                     Status:  AB - 9/28/2001                 Interval Top: 4424 ft.    Interval Bottom: 4434 ft.

 Completed Information for Formation SUSSEX
1st Production Date:5/11/1994Choke Size:0.343 in.
Formation Name:SUSSEXCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/16/1993
Treatment Summary:FRAC W/288800# 20/40 SD IN 58700 GAL X-LINED PURGEL FLUID. // KILL WELL. NU BOP. SET CIBP @4533.73'. SET PKR @ 4472' & PRESSURE TEST. RESET PKR @4381'. RIH W/NOTCHED COLLAR AND LAND BOTTOM @ 4450'. PUMP 50 SX GLASS G NEAT. DRILL OUT CEMENT. POOH W/CIBP.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:4381 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/11/1994Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 2
CALC_BBLS_H2O 12
CALC_BBLS_OIL 2
CALC_GOR 65000
CALC_MCF_GAS 130
CASING_PRESS 480
MCF_GAS 130
TUBING_PRESS 260
Perforation Data:
Interval Top:4424 ft.# Of Holes:20
Interval Bottom:4434 ft.Hole Size:3.125 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/09/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No