|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 10/1/2022 Measured TD: 8109 ft. Vertical TD: 0 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 10/1/2022 | Wellbore Permit | | Permit #: | 921196 | Expiration Date: | 1/22/1993 | Proposed Depth/Form: | | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: DK-J , Formation: DAKOTA-JSND , Order: 0 , Unit Acreage: 320, Drill Unit: E2 |
| | |
Wellbore Completed | Completion Date: | 2/3/1993 | Measured TD: | 8109 ft. | Measured PB depth: | 8050 ft. | True Vertical TD: | 0 ft. | True Vertical PB depth: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 401 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 280, Top: 0 ft., Bottom: 401 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8109 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 430, Top: 6113 ft., Bottom: 8109 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4435 ft. | | | | NIOBRARA | 6985 ft. | | | | FORT HAYS | 7252 ft. | | | | CODELL | 7274 ft. | | | | CARLILE | 7292 ft. | | | | GREENHORN | 7350 ft. | | | | J SAND | 7720 ft. | | | | DAKOTA | 7927 ft. | | | | LAKOTA | 8022 ft. | | | | MORRISON | 8050 ft. | | | |
Formation DKTA Formation Classification: OW Status: SI - 10/1/2022 Interval Top: 7944 ft. Interval Bottom: 7954 ft. Completed Information for Formation DAKOTA | 1st Production Date: | 12/12/1992 | Choke Size: | | Formation Name: | DAKOTA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/5/2012 | Treatment Summary: | DK PERF 7944-7954 HOLES 20 SIZE 0.38
3/5/12 -DRILLED OUT CIBP TO COMMINGLE WELL | Formation Treatment | Treatment Date: | 1/22/2010 | Treatment Summary: | SET CIBP @ 7230 W/ 2 SACKS OF CEMENT OVER FOR MECHANICAL INTEGRITY. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DKTA. |
| Perforation Data: | Interval Top: | 7944 ft. | # Of Holes: | 20 | Interval Bottom: | 7954 ft. | Hole Size: | |
|
Formation JSND Formation Classification: OG Status: SI - 10/1/2022 Interval Top: 7726 ft. Interval Bottom: 7790 ft. Completed Information for Formation J SAND | 1st Production Date: | 2/3/1993 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/5/2012 | Treatment Summary: | J S PERF 7726-7790 HOLES 23 SIZE 0.36
3/5/12 -DRILLED OUT CIBP TO COMMINGLE WELL | Formation Treatment | Treatment Date: | 1/22/2010 | Treatment Summary: | SET CIBP @ 7230 W/2 SACKS OF CEMENT OVER FOR MECHANICAL INTEGRITY. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7726 ft. | # Of Holes: | 23 | Interval Bottom: | 7790 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 4/12/2012 Interval Top: 7275 ft. Interval Bottom: 7291 ft. Completed Information for Formation CODELL | 1st Production Date: | 12/30/1993 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/5/2012 | Treatment Summary: | CD PERF 7275-7291 HOLES 32 SIZE 0.38
3/5/12 -DRILLED OUT CIBP TO COMMINGLE WELL | Formation Treatment | Treatment Date: | 1/21/2010 | Treatment Summary: | SET RBP @ 6870. OUR INTENT IS TO REMOVE THE RBP TO COMMINGLE THE WELL IN THE NEXT SIX MONTHS. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7275 ft. | # Of Holes: | 32 | Interval Bottom: | 7291 ft. | Hole Size: | |
|
Formation JDCNB Formation Classification: OG Status: CM - 3/16/2012 Interval Top: 6986 ft. Interval Bottom: 7954 ft. Completed Information for Formation J-D-CODELL-NIOBRARA | 1st Production Date: | 3/15/2012 | Choke Size: | | Formation Name: | J-D-CODELL-NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/5/2012 | Treatment Summary: | NB PERF 6986-7168 HOLES 82 SIZE 0.38
CD PERF 7275-7291 HOLES 32 SIZE 0.38
J S PERF 7726-7790 HOLES 23 SIZE 0.36
DK PERF 7944-7954 HOLES 20 SIZE 0.38
3/5/12 -DRILLED OUT CIBP TO COMMINGLE WELL |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7920 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/16/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 2 | BTU_GAS | 1238 | CALC_BBLS_OIL | 2 | CALC_GOR | 4000 | CALC_MCF_GAS | 8 | CASING_PRESS | 650 | GRAVITY_OIL | 60 | MCF_GAS | 8 | TUBING_PRESS | 500 |
| Perforation Data: | Interval Top: | 6986 ft. | # Of Holes: | 157 | Interval Bottom: | 7954 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OG Status: SI - 10/1/2022 Interval Top: 6986 ft. Interval Bottom: 7291 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/30/1993 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/5/2012 | Treatment Summary: | NB PERF 6986-7168 HOLES 82 SIZE 0.38
CD PERF 7275-7291 HOLES 32 SIZE 0.38
3/5/12 -DRILLED OUT CIBP TO COMMINGLE WELL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 6986 ft. | # Of Holes: | 114 | Interval Bottom: | 7291 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OG Status: CM - 4/12/2012 Interval Top: 6986 ft. Interval Bottom: 7168 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/30/1993 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/5/2012 | Treatment Summary: | NB PERF 6986-7168 HOLES 82 SIZE 0.38
3/5/12 -DRILLED OUT CIBP TO COMMINGLE WELL | Formation Treatment | Treatment Date: | 1/27/2010 | Treatment Summary: | REFRAC NBRR W/ 500 GAL 15% HCL & 226,674 GAL SW & 202,580# 40/70 SAND & 4,000# 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1196 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 17 | CALC_GOR | 12059 | CALC_MCF_GAS | 205 | CASING_PRESS | 300 | GRAVITY_OIL | 69 |
| Perforation Data: | Interval Top: | 6986 ft. | # Of Holes: | 82 | Interval Bottom: | 7168 ft. | Hole Size: | 0.42 in. |
|
Formation DK-J Formation Classification: GW Status: CM - 2/7/1993 Completed Information for Formation DAKOTA-JSND | 1st Production Date: | 2/3/1993 | Choke Size: | 1,664.000 in. | Formation Name: | DAKOTA-JSND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DK-J. |
| No Perforation Data was found for formation DK-J. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2029 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 09/30/2022 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|