Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-16156
Well Classification: GW Status: PA - 3/26/2018
Well Name/No:SHAW #12-29A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/26/2018
FacilityID:248358LocationID:328575
County:WELD #123Location:SWNW 29 2N68W 6
Field:WATTENBERG - #90750Elevation:4912 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2033FNL  919 FWLLat/Long: 40.111365 / -105.033467Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.111360 / -105.033470Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 3/26/2018             Measured TD: 8202 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 3/26/2018
Wellbore PermitDRIFTED
Permit #: Expiration Date:6/30/2012
Proposed Depth/Form:8202 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: S/2NW/4
Formation And Spacing:Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 590 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 10 ft., Bottom: 590 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 4903 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 4094 ft., Bottom: 4903 ft.
Casing:String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: , Depth: 8200 ft., Weight: 6.5 , Citings Type: PLANNED
Cement:Sacks: 130, Top: 4800 ft., Bottom: 8200 ft.

Wellbore Completed
Completion Date:7/13/2000
Spud Date:9/10/1992Spud Date Is:ACTUAL
Measured TD:8202 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:CDL - DIL - CBL
Log Types:SACNLD, SAAILC, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 581 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 581 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 4896 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 4090 ft., Bottom: 4896 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 4822 ft., Depth: 8202 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 120, Top: 4822 ft., Bottom: 8202 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4350 ft.NN
SHANNON4773 ft.NN
NIOBRARA7220 ft.NN
FORT HAYS7486 ft.NN
CODELL7507 ft.NN
J SAND7936 ft.NN
DAKOTA8081 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 3/26/2018                 Interval Top: 7944 ft.    Interval Bottom: 7958 ft.

 Completed Information for Formation J SAND
1st Production Date:7/25/2000Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/16/2012Treatment End Date:N/A
Treatment Summary:CLEARED OUT SAND PLUG TO COMMINGLE JSND PRODUCTION WITH NB/CD
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:7/23/2010
Treatment Summary:Set sand plug @ 7605'.
Formation Treatment
Treatment Date:7/13/2000
Treatment Summary:500,460# 20/40 MESH; 208,088 GALS GELLED FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 2
CALC_BBLS_H2O 0
CALC_BBLS_OIL 2
CALC_GOR 133000
CALC_MCF_GAS 266
CASING_PRESS 440
GRAVITY_OIL 60
MCF_GAS 266
TUBING_PRESS 220
Perforation Data:
Interval Top:7944 ft.# Of Holes:42
Interval Bottom:7958 ft.Hole Size:0.23 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 6/27/2012                 Interval Top: 7220 ft.    Interval Bottom: 7958 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:6/26/2012Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/27/2012Treatment End Date:N/A
Treatment Summary:CLEARED OUT SAND PLUG TO COMMINGLE JSND PRODUCTION WITH NB/CD
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7907 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/27/2012Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 2
BTU_GAS 1274
CALC_BBLS_OIL 2
CASING_PRESS 719
GRAVITY_OIL 50
TUBING_PRESS 500
Perforation Data:
Interval Top:7220 ft.# Of Holes:122
Interval Bottom:7958 ft.Hole Size:0.156 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 3/26/2018                 Interval Top: 7220 ft.    Interval Bottom: 7524 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/23/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/10/2010
Treatment Summary:NBRR Perf 7220-7400 Holes 44 Size 0.38 CODL Perf 7506-7524 Holes 36 Size 0.38 Frac NBRR w/ 250 gal 15% HCl & 170,900 gal Super Z LpH & 250,340# 20/40 sand & 4,000# SB Excel. Frac CODL w/ 135,326 gal Super Z LpH & 220,600# 20/40 sand & 4,000# SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/3/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 98
BTU_GAS 1166
CALC_BBLS_OIL 98
CALC_GOR 959
CALC_MCF_GAS 94
CASING_PRESS 1000
GRAVITY_OIL 46
MCF_GAS 94
Perforation Data:
Interval Top:7220 ft.# Of Holes:80
Interval Bottom:7524 ft.Hole Size:0.38 in.

Formation SNSD                     Formation Classification:  GW                     Status:  AB - 6/1/2000                  Interval Top: 4782 ft.    Interval Bottom: 4790 ft.

 Completed Information for Formation SHANNON
1st Production Date:10/10/1992Choke Size: 
Formation Name:SHANNONCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:7/13/2000
Treatment Summary:1,485 BBLS APOLLO 35 & 30 FLUID W/ 225,500# 12/20 MESH (40 BO IN 1ST 800 BBLS, & LAST 10,500# 12/20 MESH WAS RESIN-COATED). ATP 1301# @ 31 BPM. ISDP 730#
Tubing Size:2.375 in.Tubing Setting Depth:4754 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/22/1992Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 13
BBLS_OIL 4
CALC_BBLS_H2O 13
CALC_BBLS_OIL 4
CALC_GOR 13750
CALC_MCF_GAS 55
CASING_PRESS 24
GRAVITY_OIL 42.2
MCF_GAS 55
TUBING_PRESS 24
Perforation Data:
Interval Top:4782 ft.# Of Holes:24
Interval Bottom:4790 ft.Hole Size:0.375 in.

Formation SUSX                     Formation Classification:  GW                     Status:  AB - 6/1/2000                  Interval Top: 4350 ft.    Interval Bottom: 4360 ft.

 Completed Information for Formation SUSSEX
1st Production Date:3/11/1993Choke Size: 
Formation Name:SUSSEXCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:7/13/2000
Treatment Summary:65,000 GALS 35-D-FL GEL W/ 175,000# 12/20 SAND. TERMINATE PREMATURELY. ATP 1900# @ 35 BPM. ISDP 1000#
Tubing Size:2.375 in.Tubing Setting Depth:4347 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/19/1993Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 7
BBLS_OIL 7
CALC_BBLS_H2O 7
CALC_BBLS_OIL 7
CALC_GOR 10714
CALC_MCF_GAS 75
CASING_PRESS 167
GRAVITY_OIL 47
MCF_GAS 75
TUBING_PRESS 60
Perforation Data:
Interval Top:4350 ft.# Of Holes:20
Interval Bottom:4360 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/26/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No