Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-16147
Well Classification: GW Status: PA - 12/12/2022
Well Name/No:SCHMIDT #25-1F
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:66791
Facility Status:PAStatus Date12/12/2022
FacilityID:248349LocationID:328566
County:WELD #123Location:NENE 25 4N66W 6
Field:WATTENBERG - #90750Elevation:4768 ft.
Planned Location:872FNL  558 FELLat/Long: 40.288206 / -104.717459Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.288314 / -104.717534Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 12/12/2022             Measured TD: 7344 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 12/12/2022
Wellbore PermitDRIFTED
Permit #:921110 Expiration Date:1/3/1993
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: E2NE

Wellbore Completed
Completion Date:10/22/1992
Measured TD:7344 ft.Measured PB depth:7264 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 521 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 0 ft., Bottom: 521 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7310 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 125, Top: 6526 ft., Bottom: 7310 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7310 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 3761 ft., Bottom: 4800 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3717 ft.
SUSSEX4163 ft.
NIOBRARA6900 ft.
FORT HAYS7202 ft.
CODELL7224 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 6/15/2022                 Interval Top: 7225 ft.    Interval Bottom: 7240 ft.

 Completed Information for Formation CODELL
1st Production Date:11/2/1992Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/1/2010
Treatment Summary:CODELL SI UNDER SAND PLUG AT 7266.REMOVE SP AND COMMINGLE W/NB.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7225 ft.# Of Holes:81
Interval Bottom:7240 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 12/12/2022                Interval Top: 6920 ft.    Interval Bottom: 7240 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/2/1992Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/22/2010
Treatment Summary:COMMINGLE CODELL AND NIOBRARA
Formation Treatment
Treatment Date:10/22/1992
Treatment Summary:COMMINGLE CODELL AND NIOBRARA.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 11
BBLS_OIL 9
BTU_GAS 1238
CALC_BBLS_H2O 11
CALC_BBLS_OIL 9
CALC_GOR 26666
CALC_MCF_GAS 240
CASING_PRESS 400
GRAVITY_OIL 68
MCF_GAS 240
TUBING_PRESS 400
Perforation Data:
Interval Top:6920 ft.# Of Holes:173
Interval Bottom:7240 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 6/15/2022                 Interval Top: 6920 ft.    Interval Bottom: 7107 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/2/1992Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/1/2010
Treatment Summary:RE-FRAC'D NIOBRARA W/ 171,996 GALS OF SLICK WATER, VISTAR, AND 15% HCL WITH 249,000#'S OF OTTAWA SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 17
BTU_GAS 1238
CALC_BBLS_H2O 2
CALC_BBLS_OIL 17
CALC_GOR 18000
CALC_MCF_GAS 306
CASING_PRESS 1000
GRAVITY_OIL 67
MCF_GAS 306
TUBING_PRESS 0
Perforation Data:
Interval Top:6920 ft.# Of Holes:92
Interval Bottom:7107 ft.Hole Size:0.73 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY12/12/2022
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No