|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 12/27/2023 Measured TD: 6867 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 12/27/2023 | Wellbore Permit | | Permit #: | 19921061 | Expiration Date: | 12/23/1992 | Proposed Depth/Form: | 6870 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 80 , Unit Acreage: 80, Drill Unit: W2NE4 |
| | |
Wellbore Completed | Completion Date: | 9/10/1992 | Spud Date: | 9/5/1992 | Spud Date Is: | ACTUAL | Measured TD: | 6867 ft. | Measured PB depth: | 6816 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | COMP. DENSITY, DIL, CBL-CCL GR | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 328 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 230, Top: 0 ft., Bottom: 328 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 2.875 in., Top: 0 ft., Depth: 6865 ft., Weight: 6.5 , Citings Type: ACTUAL | Cement: | Sacks: 220, Top: 6006 ft., Bottom: 6865 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 2.875 in., Top: 0 ft., Depth: 980 ft., Weight: 6.5 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 0 ft., Bottom: 976 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4158 ft. | | N | N | NIOBRARA | 6452 ft. | | N | N | CODELL | 6711 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 3/21/2022 Interval Top: 6713 ft. Interval Bottom: 6723 ft. Completed Information for Formation CODELL | 1st Production Date: | 10/16/1992 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/21/2010 | Treatment Summary: | Codell under sand plug. remove sand plug to commingle with nbbr | Formation Treatment | Treatment Date: | 9/30/2005 | Treatment Summary: | ORIGINAL COMPLETION: 56,154 GALS SATURN 1 W/ 151,000# 20-40 SAND. 9/30/05: RE-PERF CODELL 6713'-6722', 36 HOLES, .27 INCH; REFRAC CODL W/ 128,436 GALS VISTAR W/ 23/24/25# GEL; 245,780# 20-40 OTTAWA SAND, ATP 4626 PSI, ATR 14.1 BPM |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 3 | BBLS_OIL | 8 | CALC_BBLS_H2O | 3 | CALC_BBLS_OIL | 8 | CALC_GOR | 7500 | CALC_MCF_GAS | 60 | CASING_PRESS | 500 | MCF_GAS | 60 | TUBING_PRESS | 260 |
| Perforation Data: | Interval Top: | 6713 ft. | # Of Holes: | 76 | Interval Bottom: | 6723 ft. | Hole Size: | 0.27 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 12/27/2023 Interval Top: 6452 ft. Interval Bottom: 6723 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 6/22/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/2/2010 | Treatment Summary: | Commingle Codell and Niobrara. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 9 | BBLS_OIL | 8 | BTU_GAS | 1333 | CALC_BBLS_H2O | 9 | CALC_BBLS_OIL | 8 | CALC_GOR | 11250 | CALC_MCF_GAS | 90 | CASING_PRESS | 650 | GRAVITY_OIL | 47 | MCF_GAS | 90 | TUBING_PRESS | 175 |
| Perforation Data: | Interval Top: | 6452 ft. | # Of Holes: | 180 | Interval Bottom: | 6723 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 3/21/2022 Interval Top: 6452 ft. Interval Bottom: 6544 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 6/22/2010 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/21/2010 | Treatment Summary: | Frac'd Niobrara w/ 172858 gals of Slick Water, Vistar, and 15% HCI with 248960#'s of Ottawa sand. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 113 | BBLS_OIL | 19 | BTU_GAS | 1308 | CALC_BBLS_H2O | 113 | CALC_BBLS_OIL | 19 | CALC_GOR | 2947 | CALC_MCF_GAS | 56 | CASING_PRESS | 320 | GRAVITY_OIL | 57 | MCF_GAS | 56 |
| Perforation Data: | Interval Top: | 6452 ft. | # Of Holes: | 104 | Interval Bottom: | 6544 ft. | Hole Size: | 0.27 in. |
|
|
|
|
|
Reported Plugged | Y | 12/27/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|