|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/29/2019 Measured TD: 7538 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/29/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 19920856 | Expiration Date: | 11/22/1992 | | Proposed Depth/Form: | 7500 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2NE |
| | |
| Wellbore Completed | | Completion Date: | 9/10/1992 | | Spud Date: | 8/12/1992 | Spud Date Is: | ACTUAL | | Measured TD: | 7538 ft. | Measured PB depth: | 7445 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL/SFL/GR; CBL; DEN/CNL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 516 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7486 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6206 ft., Bottom: , Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7104 ft. | | N | N | | FORT HAYS | 7365 ft. | | N | N | | CODELL | 7387 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 4/15/2010 Interval Top: 7387 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/10/1992 | Choke Size: | 0.281 in. | | Formation Name: | CODELL | Commingled: | | | Production Method: | PLUNGER | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/10/1992 | | Treatment Summary: | SEE NB-CD PAGE FOR 1ST CODL TREATMENT @ 1992. // FRAC'D CODL W/11,500# 100MESH; 250,400 20/40 MESH; 22,580 # 12/20 MESH; 107,472 GAL GELLED FLUID, 1997. // REPERF'D CODL FROM 7765-7770'. REFRAC CODL W/262,180 #20/40 MESH & 89,641 GAL. GELLED FLUID, 5/2/2002. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6509 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/20/2002 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 13 | | CALC_BBLS_OIL | 13 | | CALC_GOR | 20615 | | CALC_MCF_GAS | 268 | | CASING_PRESS | 650 | | GRAVITY_OIL | 60 | | MCF_GAS | 268 | | TUBING_PRESS | 450 |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: CM - 9/13/1992 Interval Top: 7106 ft. Interval Bottom: 7401 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/10/1992 | Choke Size: | 0.187 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | PLUNGER 500 | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/10/1992 | | Treatment Summary: | 7387-7401' FRAC'D W/175,200# 20/40 MESH SAND + 60,425 GAL GELLED FLUID. 7106-7270' FRAC'D W/228,000# 20/40 MESH SAND + 67,500 GAL GELLED FLUID. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7365 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/13/1992 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 25 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 25 | | CALC_GOR | 12240 | | CALC_MCF_GAS | 306 | | CASING_PRESS | 1800 | | GRAVITY_OIL | 60 | | MCF_GAS | 306 | | TUBING_PRESS | 1500 |
| | Perforation Data: | | Interval Top: | 7106 ft. | # Of Holes: | 45 | | Interval Bottom: | 7401 ft. | Hole Size: | 0.38 in. |
|
Sidetrack #01 Wellbore Classification: GW Status: PA - 1/29/2019 Measured TD: 7888 ft. Vertical TD: 7486 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: GW PA - 1/29/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 19960725 | Expiration Date: | 10/16/1997 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1549 FNL 786 FEL | | Bottom Hole Location: | Sec: Twp: | Footage: 1127 FNL 694 FEL | | Proposed Depth/Form: | 7820 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | Not available | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2SW |
| | |
| Wellbore Completed | | Completion Date: | 6/5/1997 | | Spud Date: | 5/2/1997 | Spud Date Is: | ACTUAL | | Measured TD: | 7888 ft. | Measured PB depth: | 7855 ft. | | True Vertical TD: | 7486 ft. | True Vertical PB depth: | 7457 ft. | | Top PZ Location: | Sec: Twp: | Footage: 1549 FNL 786 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 516 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 516 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7486 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6206 ft., Bottom: 7486 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 3.75 in., Size: 2.375 in., Top: 6550 ft., Depth: 7887 ft., Weight: 4.7 , Citings Type: ACTUAL | | Cement: | Sacks: 35, Top: 6762 ft., Bottom: 7887 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: , Depth: 7887 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 35, Top: 7160 ft., Bottom: 7887 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7290 ft. | | N | N | | FORT HAYS | 7722 ft. | | N | N | | CODELL | 7764 ft. | 7786 ft. | N | N |
Formation CODL Formation Classification: OG Status: CM - 2/29/2012 Interval Top: 7765 ft. Interval Bottom: 7770 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/10/1992 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/6/2012 | | Treatment Summary: | Trifrac CODL down 2.875" tbg w/ pkr ^ ni w/ 124,580 gal dynaflow 2 w/ 261,330# 20/40, 4,000# 20/40. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 13 | | CALC_BBLS_OIL | 13 | | CALC_GOR | 20615 | | CALC_MCF_GAS | 268 | | CASING_PRESS | 650 | | GRAVITY_OIL | 60 | | MCF_GAS | 268 | | TUBING_PRESS | 450 |
| | Perforation Data: | | Interval Top: | 7765 ft. | # Of Holes: | 48 | | Interval Bottom: | 7770 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OG Status: AB - 1/29/2019 Interval Top: 7308 ft. Interval Bottom: 7770 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/9/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/6/2012 | | Treatment Summary: | CDTRIFRAC-NBREC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/22/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 1 | | BTU_GAS | 1212 | | CALC_BBLS_OIL | 1 | | CASING_PRESS | 20 | | GRAVITY_OIL | 60 |
| | Perforation Data: | | Interval Top: | 7308 ft. | # Of Holes: | 96 | | Interval Bottom: | 7770 ft. | Hole Size: | 0.32 in. |
|
Formation NBRR Formation Classification: OG Status: CM - 5/3/2012 Interval Top: 7308 ft. Interval Bottom: 7564 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/9/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/6/2012 | | Treatment Summary: | Frac NBRR down 2.875" tbg w/ pkr ^ ni w/ 252 gal 15% HCl & 161,973 gal dynaflow 2 hybrid w/ 250,330# 20/40, 4,000# 20/40. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7308 ft. | # Of Holes: | 48 | | Interval Bottom: | 7564 ft. | Hole Size: | 0.25 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/29/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|