|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 5/8/2025 Measured TD: 7925 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 5/8/2025 | | Wellbore Permit | | | Permit #: | 20040237 | Expiration Date: | 2/24/2005 | | Proposed Depth/Form: | 7950 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2SE |
| | |
| Wellbore Completed | | Completion Date: | 8/4/2004 | | Spud Date: | 7/23/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 7925 ft. | Measured PB depth: | 7925 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL/SFL/GR; CBL; DEN/CNL/GR | | Log Types: | CBL, GR, DEEPENED - AIL, CNLD | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 450 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 315, Top: 0 ft., Bottom: 450 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7434 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 640, Top: 3910 ft., Bottom: 7434 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7372 ft., Depth: 7926 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 21, Top: 7372 ft., Bottom: 7926 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7015 ft. | | N | N | | FORT HAYS | 7285 ft. | | N | N | | CODELL | 7306 ft. | | N | N | | J SAND | 7763 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 5/8/2025 Interval Top: 7770 ft. Interval Bottom: 7814 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/16/2004 | Choke Size: | 0.406 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/22/1992 | | Treatment Summary: | 155,861 GAL FLUID; 116,080# 30/50 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7740 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7770 ft. | # Of Holes: | 93 | | Interval Bottom: | 7814 ft. | Hole Size: | 0.21 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/16/2004 Interval Top: 7016 ft. Interval Bottom: 7814 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 10/16/2004 | Choke Size: | 0.406 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/22/1992 | | Treatment Summary: | COMMINGLE JSAND W/NB-CD. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7740 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/16/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 4 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 51000 | | CALC_MCF_GAS | 204 | | CASING_PRESS | 523 | | GRAVITY_OIL | 62 | | MCF_GAS | 204 | | TUBING_PRESS | 268 |
| | Perforation Data: | | Interval Top: | 7016 ft. | # Of Holes: | | | Interval Bottom: | 7814 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/8/2025 Interval Top: 7016 ft. Interval Bottom: 7321 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/22/1992 | Choke Size: | 0.187 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/22/1992 | | Treatment Summary: | 7307-7321' FRAC'D W/350,000# 2/40 MESH SAND + 75,356 GAL GELLED FLUID. 7016-7191' FRAC'D W/228,000# 20/40 MESH SAND + 68,114 GAL GELLED FLUID. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7276 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/24/1992 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 49 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 49 | | CALC_GOR | 9429 | | CALC_MCF_GAS | 462 | | CASING_PRESS | 2500 | | GRAVITY_OIL | 60 | | MCF_GAS | 462 | | TUBING_PRESS | 2400 |
| | Perforation Data: | | Interval Top: | 7016 ft. | # Of Holes: | 44 | | Interval Bottom: | 7321 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/08/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|