Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-15903
Well Classification: OW Status: PR - 11/1/2025
Well Name/No:GLENN #41-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KP KAUFFMAN COMPANY INC - 46290
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2025
FacilityID:248105LocationID:328367
County:WELD #123Location:NENE 10 1N66W 6
Field:SPINDLE - #77900Elevation:5090 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:600FNL  665 FELLat/Long: 40.071478 / -104.756268Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.071583 / -104.756115Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2025             Measured TD: 5070 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2025
Wellbore Permit
Permit #:19920725 Expiration Date:10/24/1992
Proposed Depth/Form:5005 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: SUSX , Formation: SUSSEX , Order: 0 , Unit Acreage: 40, Drill Unit: NENE

Wellbore Completed
Completion Date:7/22/1992
Spud Date:6/29/1992Spud Date Is:ACTUAL
Measured TD:5070 ft.Measured PB depth:4948 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Log Types:DENS DIL CBL MGRD
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 306 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 4968 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 165, Top: , Bottom: , Determination Method:
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 4226 ft., Bottom: , Determination Method:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1177 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4870 ft.NN

Formation SUSX                     Formation Classification:  OW                     Status:  PR - 11/1/2025                 Interval Top: 4882 ft.    Interval Bottom: 4896 ft.

 Completed Information for Formation SUSSEX
1st Production Date:8/1/1992Choke Size:0.000 in.
Formation Name:SUSSEXCommingled:No
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:7/22/1992
Treatment Summary:290,000# 12/20 SAND & 10,000# 12/20 SAND W/80,930 GAL GEL & 50 BO. ISDP 1160#. ATP 1450# AT 32.7 BPM.
Tubing Size:2.375 in.Tubing Setting Depth:4876 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/21/1992Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 35
BBLS_OIL 60
CALC_GOR 566
CASING_PRESS 38
MCF_GAS 34
TUBING_PRESS 30
Perforation Data:
Interval Top:4882 ft.# Of Holes:42
Interval Bottom:4896 ft.Hole Size:0.375 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)337
GOR
GOR DeterminationMCFE
Average BOE per Day0.161
Average MCFE per Day0.918

 Federal Financial Assurance  i 

 Tribal Well  i No