|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 5/12/2025 Measured TD: 7990 ft. Vertical TD: 7990 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 5/12/2025 | | Wellbore Permit | | | Permit #: | 20041299 | Expiration Date: | 6/14/2005 | | Proposed Depth/Form: | 8000 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: W2NE |
| | |
| Wellbore Completed | | Completion Date: | 9/2/2004 | | Spud Date: | 6/8/1992 | Spud Date Is: | ACTUAL | | Measured TD: | 7990 ft. | Measured PB depth: | 7475 ft. | | True Vertical TD: | 7990 ft. | True Vertical PB depth: | 7475 ft. | | Log Types: | DIL/SFL/GR; CBL; DEN/CNL/GR | | Log Types: | AIL, CDL, CN, GR, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 520 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 370, Top: 0 ft., Bottom: 520 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7496 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6176 ft., Bottom: 7496 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7435 ft., Depth: 7990 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 21, Top: 7435 ft., Bottom: 7990 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7060 ft. | | N | N | | FORT HAYS | 7331 ft. | | N | N | | CODELL | 7352 ft. | | N | N | | J SAND | 7815 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 5/12/2025 Interval Top: 7830 ft. Interval Bottom: 7872 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/24/2004 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/2/2004 | | Treatment Summary: | 149,340 GAL FLUID; 4000# 12/20 SAND; 115,500# 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7830 ft. | # Of Holes: | 108 | | Interval Bottom: | 7872 ft. | Hole Size: | 0.21 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/12/2025 Interval Top: 7061 ft. Interval Bottom: 7369 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/27/1992 | Choke Size: | 0.187 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/2/2004 | | Treatment Summary: | 7352-7369' FRAC'D W/350,000# 20/40 MESH SAND + 76,098 GAL GELLED FLUID. 7060-7234' FRAC'D W/228,000# 20/40 MESH SAND + 69,336 GAL GELLED FLUID. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7344 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/30/1992 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 25 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 25 | | CALC_GOR | 13000 | | CALC_MCF_GAS | 325 | | CASING_PRESS | 2200 | | GRAVITY_OIL | 60 | | MCF_GAS | 325 | | TUBING_PRESS | 2000 |
| | Perforation Data: | | Interval Top: | 7061 ft. | # Of Holes: | 40 | | Interval Bottom: | 7369 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/24/2004| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 10/24/2004 | Choke Size: | 0.281 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/2/2004 | | Treatment Summary: | COMMINGLED J SAND & NB-CD. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7792 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/24/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 3 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 83667 | | CALC_MCF_GAS | 251 | | CASING_PRESS | 518 | | GRAVITY_OIL | 62 | | MCF_GAS | 251 | | TUBING_PRESS | 246 |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/12/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 04/30/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|