Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-15539
Well Classification: GW Status: PR - 4/30/2012
Well Name/No:ARENS #33-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/30/2012
FacilityID:247741LocationID:328095
County:WELD #123Location:NWSE 15 4N65W 6
Field:WATTENBERG - #90750Elevation:4695 ft.
Planned Location:2170FSL  1985 FELLat/Long: 40.311036 / -104.646777Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.311039 / -104.646970Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/6/2012
End Date: 1/6/2012
Reported: 7/2/2012
Prior to rule 205A.b.(2)(A)
Days to report: 178
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/30/2012             Measured TD: 7266 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/30/2012
Wellbore Permit
Permit #:20031874 Expiration Date:9/29/2004
Proposed Depth/Form:7266 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: 318A , Unit Acreage: 80, Drill Unit: W/2SE
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 2 , Unit Acreage: 80, Drill Unit: W2SE
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 465 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 0 ft., Bottom: 465 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7256 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 220, Top: 6342 ft., Bottom: 7256 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4770 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 410, Top: 3720 ft., Bottom: 4770 ft.

Wellbore Completed
Completion Date:3/6/1992
Spud Date:1/16/1992Spud Date Is:ACTUAL
Measured TD:7266 ft.Measured PB depth:7213 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 465 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 150, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7256 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4374 ft.
NIOBRARA6772 ft.
FORT HAYS7040 ft.
CODELL7064 ft.

Formation GRNHN                   Formation Classification:  GW                   Status:  TA - 4/30/2012                 Interval Top: 7140 ft.    Interval Bottom: 7180 ft.

 Completed Information for Formation GREENHORN
1st Production Date:10/10/2003Choke Size: 
Formation Name:GREENHORNCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/28/2011
Treatment Summary:CIBP set @ 7105' to refrac and test the NB-CD.
Formation Treatment
Treatment Date:3/6/1992
Treatment Summary:SEE OGCC COMMENTS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 2
CALC_BBLS_H2O 2
CALC_BBLS_OIL 2
CALC_GOR 12000
CALC_MCF_GAS 24
CASING_PRESS 500
MCF_GAS 24
TUBING_PRESS 400
Perforation Data:
Interval Top:7140 ft.# Of Holes:160
Interval Bottom:7180 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 11/7/2012                 Interval Top: 7064 ft.    Interval Bottom: 7080 ft.

 Completed Information for Formation CODELL
1st Production Date:3/6/1992Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/6/2012
Treatment Summary:Frac’d w/ 2720 bbls frac fluid and 194,304# sand
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7064 ft.# Of Holes:32
Interval Bottom:7080 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 4/30/2012                 Interval Top: 6772 ft.    Interval Bottom: 7080 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/6/1992Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/6/2012
Treatment Summary:Niobrara: 6772-7000’ - Frac’d w/ 134,609 gal frac fluid and 250,180# sand Codell Frac: 7064-7080’ - Frac’d w/ 114,240 gal frac fluid and 194,304# sand
Formation Treatment
Treatment Date:3/6/1992
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7053 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/11/2012Test Method:FLOW
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 39
BBLS_OIL 40
BTU_GAS 1
CALC_BBLS_H2O 39
CALC_BBLS_OIL 40
CALC_GOR 5750
CALC_MCF_GAS 230
CASING_PRESS 590
GRAVITY_OIL 61
MCF_GAS 230
TUBING_PRESS 530
Perforation Data:
Interval Top:6772 ft.# Of Holes:200
Interval Bottom:7080 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 9/11/2012                 Interval Top: 6772 ft.    Interval Bottom: 7000 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/6/1992Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/26/2011
Treatment Summary:Frac’d w/ 3205 bbls frac fluid and 250,180# sand
Formation Treatment
Treatment Date:3/6/1992
Treatment Summary:PERF'D THE NIOBRARA FROM 6790'-6820', 6970'-7000' W/2 SPF. SET CIBP @7058'. MIX AND PLACE 1 SACK OF CEMENT ON CIBP. SET PKR. SET RBP @ 7030. PLACE 5 GL OF SAND ON RBP. TEST IN FRAC STRING. FRAC'D W/116,088 GAL FRAC FLUID AND 203,320# 20/40 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_H2O 19
BBLS_OIL 7
CALC_BBLS_H2O 19
CALC_BBLS_OIL 7
CALC_GOR 13714
CALC_MCF_GAS 95
CASING_PRESS 990
MCF_GAS 96
Perforation Data:
Interval Top:6772 ft.# Of Holes:168
Interval Bottom:7000 ft.Hole Size:0.33 in.

Formation SUSX                     Formation Classification:  GW                     Status:  AB - 4/30/2012                 Interval Top: 4380 ft.    Interval Bottom: 4405 ft.

 Completed Information for Formation SUSSEX
1st Production Date:1/29/1993Choke Size: 
Formation Name:SUSSEXCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/25/2008
Treatment Summary:Squeeze Sussex Perf (1/25/02) Squeeze w/ 50 sxs premium cement
Formation Treatment
Treatment Date:3/6/1992
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SUSX.
Perforation Data:
Interval Top:4380 ft.# Of Holes:50
Interval Bottom:4405 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)187
Total Gas Produced (MCF)9239
GOR49406
GOR DeterminationMCFE
Average BOE per Day4.863
Average MCFE per Day28.226

 Federal Financial Assurance  i 

 Tribal Well  i No