|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/19/2019 Measured TD: 8451 ft. Vertical TD: 0 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/19/2019 | Wellbore Permit | | Permit #: | 19980323 | Expiration Date: | 3/29/1999 | Proposed Depth/Form: | 8651 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: J-CDL , Formation: J-CODELL , Order: 89 , Unit Acreage: 320, Drill Unit: W2 |
| | |
Wellbore Completed | Completion Date: | 1/9/1992 | Spud Date: | 12/28/1991 | Spud Date Is: | ACTUAL | Measured TD: | 8451 ft. | Measured PB depth: | 8393 ft. | True Vertical TD: | 0 ft. | True Vertical PB depth: | | Log Types: | DIL, SP, GR, CAL, CNL, LDT | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 877 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 620, Top: 0 ft., Bottom: 877 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8445 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 1367, Top: 3430 ft., Bottom: 8445 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4690 ft. | | | | SHANNON | 5140 ft. | | | | NIOBRARA | 7446 ft. | | | | CODELL | 7777 ft. | | | | J SAND | 8222 ft. | | | | DAKOTA | 8386 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 8/19/2019 Interval Top: 8224 ft. Interval Bottom: 8248 ft. Completed Information for Formation J SAND | 1st Production Date: | 7/30/1993 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 2/27/2019 | Treatment End Date: | N/A | Treatment Summary: | CIRC SAND OFF OF BRIDGE PLUG @ 7701', RELEASE RBP
8/6/2018 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 1/9/1992 | Treatment Summary: | FRAC DOWN CSG. PAD 80,000 GAL 35# XLINK GAUR. PUMP 99,100 GAL 35# XLINK GAUR W/ 359,160# 20/40 SAND. FLUSH W/ 173 BBL 2% KCL. ATP 2400 PWI AIR 35 BPM |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8224 ft. | # Of Holes: | 96 | Interval Bottom: | 8248 ft. | Hole Size: | 0.5 in. |
|
Formation CODL Formation Classification: GW Status: AB - 8/19/2019 Interval Top: 7780 ft. Interval Bottom: 7808 ft. Completed Information for Formation CODELL | 1st Production Date: | 7/30/1993 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 2/27/2019 | Treatment End Date: | N/A | Treatment Summary: | CIRC SAND OFF OF BRIDGE PLUG @ 7701', RELEASE RBP
8/6/2018 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 1/9/1992 | Treatment Summary: | DIVERTAFRAC W/ 3,000 GAL 40# XLINK, 9,000 GAL 40# SLICK WATER & 4,500# DIVERTAFRAC SAND. FRAC DOWN CSG. PAD W/ 25,000 GAL 35# XLINK. PUMP 57,000 GAL 35# XLINK WITH 250,000# 20/40 SAND. FLUSH W/ 175 BBL 2% KCL. ATP 2800 PSI AIR 12 BPM |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7780 ft. | # Of Holes: | 112 | Interval Bottom: | 7808 ft. | Hole Size: | 0.5 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 9/1/1999 Interval Top: 7780 ft. Interval Bottom: 8248 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 7/30/1993 | Choke Size: | 0.375 in. | Formation Name: | J-CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8007 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/13/1993 | Test Method: | FLOWING | Hours Tested: | 11 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 20 | BBLS_OIL | 64 | BTU_GAS | 43 | CALC_BBLS_OIL | 140 | CALC_GOR | 8679 | CALC_MCF_GAS | 1215 | CASING_PRESS | 2000 | MCF_GAS | 557 | TUBING_PRESS | 1850 |
| Perforation Data: | Interval Top: | 7780 ft. | # Of Holes: | 308 | Interval Bottom: | 8248 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
Reported Plugged | Y | 08/19/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|