Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-15436
Well Classification: GW Status: SI - 6/1/2022
Well Name/No:HSR-CORVI #2-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:67673
Facility Status:SIStatus Date6/1/2022
FacilityID:247639LocationID:328016
County:WELD #123Location:NWNE 36 4N66W 6
Field:WATTENBERG - #90750Elevation:4819 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1080FNL  1980 FELLat/Long: 40.273026 / -104.722599Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.273019 / -104.722636Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 6/1/2022             Measured TD: 7417 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 6/1/2022
Wellbore Permit
Permit #:911189 Expiration Date:5/30/1997
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:STATESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: N2NE

Wellbore Completed
Completion Date:N/A
Spud Date:2/14/1992Spud Date Is:ACTUAL
Measured TD:7417 ft.Measured PB depth:7270 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 424 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 424 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 424 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 300, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7417 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 6650 ft., Bottom: 7417 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7407 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7417 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 165, Top: 4130 ft., Bottom: 4490 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1300 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 515, Top: 250 ft., Bottom: 1350 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 256 ft., Depth: 1300 ft., Bottom: 1370 ft., Sacks: 515, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6972 ft.
FORT HAYS7250 ft.
CODELL7272 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 9/16/2008                 Interval Top: 7274 ft.    Interval Bottom: 7288 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/13/1992
Treatment Summary:NO ADDITIONAL TREATMENT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7274 ft.# Of Holes:28
Interval Bottom:7288 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 6/1/2022                  Interval Top: 6973 ft.    Interval Bottom: 7288 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/2/2008Choke Size:0.281 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/13/1992
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7240 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/16/2008Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1221
CALC_BBLS_H2O 0
CALC_BBLS_OIL 3
CALC_GOR 61333
CALC_MCF_GAS 184
CASING_PRESS 750
GRAVITY_OIL 51
TUBING_PRESS 600
Perforation Data:
Interval Top:6973 ft.# Of Holes:68
Interval Bottom:7288 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 9/16/2008                 Interval Top: 6973 ft.    Interval Bottom: 7159 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/12/2008
Treatment Summary:NEW PERF INTERVALS: 6976-86', 7064-68', 7138-44'. 40 SHOTS. FRAC W/ 67,634 GALS SW; 95,852 GALS SILVERSTIM; 250,440# 20/40 SAND; & 4000# 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6973 ft.# Of Holes:40
Interval Bottom:7159 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
05/31/2022
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No