|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 3/1/2025 Measured TD: 8190 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 3/1/2025 | | Wellbore Permit | | | Permit #: | 19911146 | Expiration Date: | 11/3/1998 | | Proposed Depth/Form: | 8190 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: S2 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 12/9/1991 | Spud Date Is: | ACTUAL | | Measured TD: | 8190 ft. | Measured PB depth: | 8131 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL/Gyro | | Log Types: | SFL/GR, CNL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 500 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 0 ft., Bottom: 500 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8146 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 825, Top: 0 ft., Bottom: , Determination Method: | | Additional Cement: | String Type: 1ST , Top: 0 ft., Depth: , Bottom: 600 ft., Sacks: 200, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4420 ft. | | | | | SHANNON | 4970 ft. | | | | | NIOBRARA | 7270 ft. | | | | | FORT HAYS | 7517 ft. | | | | | CODELL | 7540 ft. | | | | | J SAND | 7970 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 3/1/2025 Interval Top: 7970 ft. Interval Bottom: 8078 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/2/1992 | Choke Size: | 0.218 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/2/1992 | | Treatment Summary: | SEE SCAN DOCUMENT |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/2/1992 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 8 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 125000 | | CALC_MCF_GAS | 1000 | | CASING_PRESS | 900 | | MCF_GAS | 1000 |
| | Perforation Data: | | Interval Top: | 7970 ft. | # Of Holes: | 2 | | Interval Bottom: | 8078 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 4/23/1998 Interval Top: 7542 ft. Interval Bottom: 7558 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/20/1998 | Choke Size: | 0.500 in. | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | PLUNGER 500 | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/2/1992 | | Treatment Summary: | SEE SCAN DOCUMENT |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7540 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/18/1998 | Test Method: | PLUNGER 500 | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | BBLS_OIL | 22 | | BTU_GAS | 1246 | | CALC_BBLS_H2O | 13 | | CALC_BBLS_OIL | 22 | | CALC_GOR | 2091 | | CALC_MCF_GAS | 46 | | CASING_PRESS | 920 | | GRAVITY_OIL | 47.9 | | MCF_GAS | 46 | | TUBING_PRESS | 890 |
| | Perforation Data: | | Interval Top: | 7542 ft. | # Of Holes: | 32 | | Interval Bottom: | 7558 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 5/15/1998 Interval Top: 7542 ft. Interval Bottom: 8040 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 4/3/1998 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | PLUNGER 500 | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7956 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/3/1998 | Test Method: | PLUNGER 500 | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 15 | | BTU_GAS | 1246 | | CALC_BBLS_H2O | 8 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 24200 | | CALC_MCF_GAS | 363 | | CASING_PRESS | 320 | | GRAVITY_OIL | 44.8 | | MCF_GAS | 363 | | TUBING_PRESS | 150 |
| | Perforation Data: | | Interval Top: | 7542 ft. | # Of Holes: | 156 | | Interval Bottom: | 8040 ft. | Hole Size: | 0.38 in. |
|
Formation JDCNB Formation Classification: GW Status: CM - 7/24/2008 Interval Top: 7330 ft. Interval Bottom: 8040 ft.| Completed Information for Formation J-D-CODELL-NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-D-CODELL-NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/2/1992 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. DRILLED OUT CBP'S @ 7450' AND 7650' TO COMMINGLE THE JSND-NBRR-CDL. 7/20/08 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7966 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/24/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 7 | | BTU_GAS | 1166 | | CALC_BBLS_H2O | 1 | | CALC_BBLS_OIL | 7 | | CALC_GOR | 9429 | | CALC_MCF_GAS | 66 | | CASING_PRESS | 479 | | GRAVITY_OIL | 47 | | MCF_GAS | 66 | | TUBING_PRESS | 265 |
| | Perforation Data: | | Interval Top: | 7330 ft. | # Of Holes: | 224 | | Interval Bottom: | 8040 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 3/1/2025 Interval Top: 7330 ft. Interval Bottom: 7560 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/20/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/26/2008 | | Treatment Summary: | NBRR-CODL RE-FRAC & RECOMPLETION. SET CBP @7650'. 6/15/08. RE-FRAC'D CODL W/ 104328 GAL FRAC FLUID & 254220# SAND. 6/26/08. SET CBP @ 7450'. 6/29/08. FRAC'D THE NBRR W/ 114482 GAL FRAC FLUID & 253980# SAND. 7/6/08 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7330 ft. | # Of Holes: | 100 | | Interval Bottom: | 7560 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 02/28/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 4 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.011 |
| Federal Financial Assurance | i | |
|
|