|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2025 Measured TD: 8077 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2025 | | Wellbore Permit | | | Permit #: | 20000097 | Expiration Date: | 2/9/2001 | | Proposed Depth/Form: | 8150 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2SW |
| | |
| Wellbore Completed | | Completion Date: | 3/22/2000 | | Spud Date: | 2/22/1992 | Spud Date Is: | ACTUAL | | Measured TD: | 8077 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | FIL, FDC, CBL | | Log Types: | SAAILC,SACNLD,CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 510 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 265, Top: 0 ft., Bottom: 510 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7492 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6214 ft., Bottom: 7492 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7445 ft., Depth: 8075 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 35, Top: 7445 ft., Bottom: 8075 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3863 ft. | | N | N | | SUSSEX | 4325 ft. | | N | N | | NIOBRARA | 7053 ft. | | N | N | | FORT HAYS | 7348 ft. | | N | N | | CODELL | 7369 ft. | | N | N | | J SAND | 7810 ft. | | N | N | | DAKOTA | 8024 ft. | | N | N |
Formation JSND Formation Classification: GW Status: TA - 4/17/2025 Interval Top: 7827 ft. Interval Bottom: 7877 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/28/2000 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/27/2010 | | Treatment Summary: | sand plug @ 7438' | | Formation Treatment | | Treatment Date: | 3/22/2000 | | Treatment Summary: | FRAC'D JSND W/560160# 20/40 MESH; 237930 GAL GELLED FLUID. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 9 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 9 | | CALC_GOR | 69556 | | CALC_MCF_GAS | 626 | | CASING_PRESS | 620 | | GRAVITY_OIL | 60 | | MCF_GAS | 626 | | TUBING_PRESS | 450 |
| | Perforation Data: | | Interval Top: | 7827 ft. | # Of Holes: | 100 | | Interval Bottom: | 7877 ft. | Hole Size: | |
|
Formation JDCNB Formation Classification: GW Status: CM - 4/28/2025 Interval Top: 7079 ft. Interval Bottom: 7387 ft.| Completed Information for Formation J-D-CODELL-NIOBRARA | | 1st Production Date: | 5/12/2000 | Choke Size: | | | Formation Name: | J-D-CODELL-NIOBRARA | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JDCNB. |
| | Perforation Data: | | Interval Top: | 7079 ft. | # Of Holes: | 195 | | Interval Bottom: | 7387 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/12/2000 Interval Top: 7079 ft. Interval Bottom: 7387 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 5/12/2000 | Choke Size: | 0.250 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | PLUNGER | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/22/2000 | | Treatment Summary: | COMMINGLED. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7421 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/12/2000 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 9 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 9 | | CALC_GOR | 69556 | | CALC_MCF_GAS | 626 | | CASING_PRESS | 620 | | GRAVITY_OIL | 60 | | MCF_GAS | 626 | | TUBING_PRESS | 450 |
| | Perforation Data: | | Interval Top: | 7079 ft. | # Of Holes: | | | Interval Bottom: | 7387 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: SI - 5/1/2025 Interval Top: 7079 ft. Interval Bottom: 7382 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/18/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/5/2011 | | Treatment Summary: | Re-Frac Codell down 2-7/8" Tbg w/ Pkr ^ Nio w/ 122,325 gal Super Z LpH w/ 261,020# 20/40, 4,000# SB Excel.
No treatment done on the Niobrara.
Returned downline on 1/25/2011. | | Formation Treatment | | Treatment Date: | 3/22/2000 | | Treatment Summary: | 7371-7387' ACIDIZE W/500 GAL 7.5% HCI; FRAC W/65,000 GAL 2% KCI WTR W/40# GUAR W/10,000# 100 MESH SAND & 200,000# 20/40 MESH SAND. 7079-7235' ACIDIZE W/1,000 GAL 7.5% HCI; FRAC W/70,980 GAL 2% KCI WTR W/40# HPG; W/12,940# 100 MESH SAND & 163,000# 20/40 MESH SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 9 | | BBLS_OIL | 3 | | BTU_GAS | 1235 | | CALC_BBLS_H2O | 9 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 30333 | | CALC_MCF_GAS | 91 | | CASING_PRESS | 316 | | GRAVITY_OIL | 58 | | MCF_GAS | 91 | | TUBING_PRESS | 248 |
| | Perforation Data: | | Interval Top: | 7079 ft. | # Of Holes: | 95 | | Interval Bottom: | 7382 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/02/2026 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 12/17/2024 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|