|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/6/2017 Measured TD: 8670 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/6/2017 | | Wellbore Permit | | | Permit #: | 19910756 | Expiration Date: | 12/26/1991 | | Proposed Depth/Form: | 8691 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 0 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-125 , Unit Acreage: 320, Drill Unit: S2 |
| | |
| Wellbore Completed | | Completion Date: | 12/13/1991 | | Spud Date: | 9/10/1991 | Spud Date Is: | ACTUAL | | Measured TD: | 8670 ft. | Measured PB depth: | 8635 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | DIL, SP, CAL, CNL LDT, GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 890 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 600, Top: 0 ft., Bottom: 890 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8660 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1165, Top: 4090 ft., Bottom: 8660 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4700 ft. | | N | N | | SHANNON | 5350 ft. | | N | N | | NIOBRARA | 7382 ft. | | N | N | | CODELL | 7828 ft. | | N | N | | MOWRY | 8242 ft. | | N | N | | J SAND | 8264 ft. | | N | N | | MUDDY J | 8264 ft. | | N | N | | DAKOTA | 8430 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: AB - 2/6/2017 Interval Top: 8430 ft. Interval Bottom: 8512 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | 11/22/1991 | Choke Size: | 0.000 in. | | Formation Name: | DAKOTA | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8431 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/13/1991 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 17 | | BBLS_OIL | 6 | | CALC_GOR | 118000 | | CASING_PRESS | 750 | | MCF_GAS | 708 | | TUBING_PRESS | 610 |
| | Perforation Data: | | Interval Top: | 8430 ft. | # Of Holes: | 168 | | Interval Bottom: | 8512 ft. | Hole Size: | 0.5 in. |
|
Formation JSND Formation Classification: GW Status: AB - 2/6/2017 Interval Top: 8264 ft. Interval Bottom: 8300 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/29/1992 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/13/1991 | | Treatment Summary: | FRAC DOWN CASING. PAD 80,000 GAL W/35 GEL. PUMP 99,100 GAL W/35# GEL & 357,980# 20/40 SN. ATP 2100, AIR 35 BPM. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8262 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8264 ft. | # Of Holes: | 144 | | Interval Bottom: | 8300 ft. | Hole Size: | 0.5 in. |
|
Formation DKJNC Formation Classification: GW Status: CM - 2/6/2017 Interval Top: 7400 ft. Interval Bottom: 8512 ft.| Completed Information for Formation DAKOTA-J-NIOBRARA-CODELL | | 1st Production Date: | 10/14/1996 | Choke Size: | | | Formation Name: | DAKOTA-J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8449 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/14/1996 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 29 | | BBLS_OIL | 22 | | CALC_GOR | 20681.82 | | MCF_GAS | 455 |
| | Perforation Data: | | Interval Top: | 7400 ft. | # Of Holes: | 560 | | Interval Bottom: | 8512 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/6/2017 Interval Top: 7400 ft. Interval Bottom: 7845 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/19/1996 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/13/1991 | | Treatment Summary: | PUMPED 1072 BBLS OF GEL AND 1963 BBLS OF GEL WITH 400,000 LBS OF 20/40 SAND. FLUSHED WITH 170 BBLS OF 2% KCL. MAX PSI: 3,100, MAX RATE: 30.3 BPM. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7800 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/19/1996 | Test Method: | FLOWING | | Hours Tested: | 12 | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 45 | | BBLS_OIL | 14 | | CALC_BBLS_H2O | 90 | | CALC_BBLS_OIL | 28 | | CALC_GOR | 9285.71 | | CALC_MCF_GAS | 260 | | CASING_PRESS | 200 | | MCF_GAS | 130 |
| | Perforation Data: | | Interval Top: | 7400 ft. | # Of Holes: | 248 | | Interval Bottom: | 7845 ft. | Hole Size: | 0.38 in. |
|
Formation DK-J Formation Classification: GW Status: CM - 2/6/2017| Completed Information for Formation DAKOTA-JSND | | 1st Production Date: | 11/29/1992 | Choke Size: | 0.281 in. | | Formation Name: | DAKOTA-JSND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/30/1992 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 30 | | BBLS_OIL | 3 | | CALC_GOR | 167333 | | CASING_PRESS | 660 | | MCF_GAS | 502 | | TUBING_PRESS | 470 |
| | No Perforation Data was found for formation DK-J. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/06/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|