|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/2/2022 Measured TD: 7522 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/2/2022 | | Wellbore Permit | | | Permit #: | 20011532 | Expiration Date: | 8/9/2002 | | Proposed Depth/Form: | 7960 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2SW | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 |
| | |
| Wellbore Completed | | Completion Date: | 8/16/1991 | | Spud Date: | 8/11/1991 | Spud Date Is: | ACTUAL | | Measured TD: | 7522 ft. | Measured PB depth: | 7456 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL/SFL/GR; CBL; DEN/CNL/GR | | Log Types: | SATAILC, SATCNTLD, CBL | | Log Types: | CVBL-GR-CCL RUN 1/9/2009 FOR SQUEEZE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 545 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 390, Top: 0 ft., Bottom: 545 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7481 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 145, Top: 6710 ft., Bottom: 7481 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6570 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 5710 ft., Bottom: 6600 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 4800 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 4285 ft., Bottom: 4800 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 0 ft., Depth: 7986 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 35, Top: 7431 ft., Bottom: 7986 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 5710 ft., Depth: 6570 ft., Bottom: 6600 ft., Sacks: 220, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 4285 ft., Depth: 4800 ft., Bottom: 4832 ft., Sacks: 280, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7066 ft. | | | | | FORT HAYS | 7344 ft. | | | | | CODELL | 7365 ft. | | | | | J SAND | 7830 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 3/2/2022 Interval Top: 7832 ft. Interval Bottom: 7886 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/19/2001 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | PLUNGER 500 | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/30/2001 | | Treatment Summary: | FRAC'D J SAND W/383,160# 20/40 MESH; 164,423 GAL GELLED FLUID. NO J TEST. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7832 ft. | # Of Holes: | | | Interval Bottom: | 7886 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 2/6/2002 Interval Top: 7366 ft. Interval Bottom: 7382 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/30/1991 | Choke Size: | 0.156 in. | | Formation Name: | CODELL | Commingled: | | | Production Method: | PLUNGER 500 | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/30/2001 | | Treatment Summary: | 240,000# 20/40 MESH SAND + 65,173 GALS GELLED FLUID. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7303 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/1/1991 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 15 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 16867 | | CALC_MCF_GAS | 253 | | CASING_PRESS | 1900 | | GRAVITY_OIL | 60 | | MCF_GAS | 253 | | TUBING_PRESS | 1700 |
| | Perforation Data: | | Interval Top: | 7366 ft. | # Of Holes: | 26 | | Interval Bottom: | 7382 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 2/6/2002 Interval Top: 7072 ft. Interval Bottom: 7886 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 11/12/2001 | Choke Size: | 0.500 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | PLUNGER | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/30/2001 | | Treatment Summary: | SEE INDIV. FORMATIONS FOR TREATMENT DETAILS. J SAND COMMINGLED WITH NB-CD |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7789 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/19/2001 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 5 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 33000 | | CALC_MCF_GAS | 165 | | CASING_PRESS | 550 | | GRAVITY_OIL | 60 | | MCF_GAS | 165 | | TUBING_PRESS | 350 |
| | Perforation Data: | | Interval Top: | 7072 ft. | # Of Holes: | | | Interval Bottom: | 7886 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/2/2022 Interval Top: 7072 ft. Interval Bottom: 7382 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/23/1991 | Choke Size: | 0.156 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | PLUNGER 500 | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/30/2001 | | Treatment Summary: | 228,000# 20/40 MESH SAND + 68,700 GALS GELLED FLUID. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7336 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/27/1991 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 4 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 50000 | | CALC_MCF_GAS | 200 | | CASING_PRESS | 1700 | | GRAVITY_OIL | 60 | | MCF_GAS | 200 | | TUBING_PRESS | 1250 |
| | Perforation Data: | | Interval Top: | 7072 ft. | # Of Holes: | 44 | | Interval Bottom: | 7382 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 2/6/2002 Interval Top: 7072 ft. Interval Bottom: 7252 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/23/1991 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | | | Production Method: | PLUNGER 500 | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/30/2001 | | Treatment Summary: | 228,000# 20/40 MESH SAND + 68,700 GALS GELLED FLUID. NO NBRR TEST. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7072 ft. | # Of Holes: | 18 | | Interval Bottom: | 7252 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/02/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|