Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-15143
Well Classification: GW Status: PA - 3/2/2022
Well Name/No:HSR-BROWN #14-1A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/2/2022
FacilityID:247346LocationID:327782
County:WELD #123Location:SESW 1 3N66W 6
Field:WATTENBERG - #90750Elevation:4928 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FSL  2025 FWLLat/Long: 40.248696 / -104.727669Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.248480 / -104.727597Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 3/2/2022             Measured TD: 7522 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 3/2/2022
Wellbore Permit
Permit #:20011532 Expiration Date:8/9/2002
Proposed Depth/Form:7960 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2SW
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:8/16/1991
Spud Date:8/11/1991Spud Date Is:ACTUAL
Measured TD:7522 ft.Measured PB depth:7456 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL/SFL/GR; CBL; DEN/CNL/GR
Log Types:SATAILC, SATCNTLD, CBL
Log Types:CVBL-GR-CCL RUN 1/9/2009 FOR SQUEEZE
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 545 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 390, Top: 0 ft., Bottom: 545 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7481 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 145, Top: 6710 ft., Bottom: 7481 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6570 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 5710 ft., Bottom: 6600 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 4800 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 4285 ft., Bottom: 4800 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 0 ft., Depth: 7986 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 35, Top: 7431 ft., Bottom: 7986 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 5710 ft., Depth: 6570 ft., Bottom: 6600 ft., Sacks: 220, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 4285 ft., Depth: 4800 ft., Bottom: 4832 ft., Sacks: 280, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7066 ft.
FORT HAYS7344 ft.
CODELL7365 ft.
J SAND7830 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 3/2/2022                  Interval Top: 7832 ft.    Interval Bottom: 7886 ft.

 Completed Information for Formation J SAND
1st Production Date:12/19/2001Choke Size: 
Formation Name:J SANDCommingled:
Production Method:PLUNGER 500
Open Hole Completion:
Formation Treatment
Treatment Date:10/30/2001
Treatment Summary:FRAC'D J SAND W/383,160# 20/40 MESH; 164,423 GAL GELLED FLUID. NO J TEST.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7832 ft.# Of Holes:
Interval Bottom:7886 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/6/2002                  Interval Top: 7366 ft.    Interval Bottom: 7382 ft.

 Completed Information for Formation CODELL
1st Production Date:8/30/1991Choke Size:0.156 in.
Formation Name:CODELLCommingled:
Production Method:PLUNGER 500
Open Hole Completion:
Formation Treatment
Treatment Date:10/30/2001
Treatment Summary:240,000# 20/40 MESH SAND + 65,173 GALS GELLED FLUID.
Tubing Size:2.375 in.Tubing Setting Depth:7303 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/1/1991Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 15
CALC_BBLS_H2O 0
CALC_BBLS_OIL 15
CALC_GOR 16867
CALC_MCF_GAS 253
CASING_PRESS 1900
GRAVITY_OIL 60
MCF_GAS 253
TUBING_PRESS 1700
Perforation Data:
Interval Top:7366 ft.# Of Holes:26
Interval Bottom:7382 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 2/6/2002                  Interval Top: 7072 ft.    Interval Bottom: 7886 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:11/12/2001Choke Size:0.500 in.
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:PLUNGER
Open Hole Completion:
Formation Treatment
Treatment Date:10/30/2001
Treatment Summary:SEE INDIV. FORMATIONS FOR TREATMENT DETAILS. J SAND COMMINGLED WITH NB-CD
Tubing Size:2.375 in.Tubing Setting Depth:7789 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/19/2001Test Method:PLUNGER
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 5
CALC_BBLS_OIL 5
CALC_GOR 33000
CALC_MCF_GAS 165
CASING_PRESS 550
GRAVITY_OIL 60
MCF_GAS 165
TUBING_PRESS 350
Perforation Data:
Interval Top:7072 ft.# Of Holes:
Interval Bottom:7886 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 3/2/2022                  Interval Top: 7072 ft.    Interval Bottom: 7382 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/23/1991Choke Size:0.156 in.
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:PLUNGER 500
Open Hole Completion:
Formation Treatment
Treatment Date:10/30/2001
Treatment Summary:228,000# 20/40 MESH SAND + 68,700 GALS GELLED FLUID.
Tubing Size:2.375 in.Tubing Setting Depth:7336 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/27/1991Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 4
CALC_BBLS_H2O 0
CALC_BBLS_OIL 4
CALC_GOR 50000
CALC_MCF_GAS 200
CASING_PRESS 1700
GRAVITY_OIL 60
MCF_GAS 200
TUBING_PRESS 1250
Perforation Data:
Interval Top:7072 ft.# Of Holes:44
Interval Bottom:7382 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/6/2002                  Interval Top: 7072 ft.    Interval Bottom: 7252 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/23/1991Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:PLUNGER 500
Open Hole Completion:
Formation Treatment
Treatment Date:10/30/2001
Treatment Summary:228,000# 20/40 MESH SAND + 68,700 GALS GELLED FLUID. NO NBRR TEST.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7072 ft.# Of Holes:18
Interval Bottom:7252 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/02/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No