|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 12/11/2018 Measured TD: 8716 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 12/11/2018 | | Wellbore Permit | DRIFTED | | Permit #: | 19910503 | Expiration Date: | 6/20/1992 | | Proposed Depth/Form: | 8875 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 232-47 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2 |
| | |
| Wellbore Completed | | Completion Date: | 8/6/1993 | | Spud Date: | 7/7/1991 | Spud Date Is: | ACTUAL | | Measured TD: | 8716 ft. | Measured PB depth: | 8657 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | IND, SPH, CAL, GR, NEU, DEN | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 985 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 1050, Top: 0 ft., Bottom: 985 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8700 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 405, Top: 5416 ft., Bottom: 8700 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 8700 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 733, Top: 4050 ft., Bottom: 5320 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4637 ft. | | | | | SHANNON | 5230 ft. | | | | | NIOBRARA | 7486 ft. | | | | | CODELL | 7878 ft. | | | | | J SAND | 8310 ft. | | | | | DAKOTA | 8476 ft. | | | |
Formation DKTA Formation Classification: GW Status: AB - 12/11/2018 Interval Top: 8476 ft. Interval Bottom: 8602 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | 1/9/1992 | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 11 | | BBLS_OIL | 1 | | CASING_PRESS | 235 | | MCF_GAS | 307 | | TUBING_PRESS | 180 |
| | Perforation Data: | | Interval Top: | 8476 ft. | # Of Holes: | 168 | | Interval Bottom: | 8602 ft. | Hole Size: | 0.5 in. |
|
Formation JSND Formation Classification: GW Status: AB - 12/11/2018 Interval Top: 8322 ft. Interval Bottom: 8364 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Date: | 8/6/1993 | | Treatment Summary: | FRAC DOWN CSG. W/ 179,000 GAL 35# GEL & 358,000# 20/40 M. FLUSH W/ 179 BBL 2% KCL. ATP 1,900 PSI. AIR 35 BPM |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8322 ft. | # Of Holes: | 168 | | Interval Bottom: | 8364 ft. | Hole Size: | 0.5 in. |
|
Formation CODL Formation Classification: GW Status: AB - 12/11/2018 Interval Top: 7880 ft. Interval Bottom: 7898 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Date: | 8/6/1993 | | Treatment Summary: | FRAC DOWN CSG W/ 82,000 GAL 35# GEL & 250,000# 20/40 M. FLUSH W/ 178 BBL 2% KCL. ATP 2,500 PSI. AIR 12 BPM |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7880 ft. | # Of Holes: | 72 | | Interval Bottom: | 7898 ft. | Hole Size: | 0.5 in. |
|
Formation DKJCD Formation Classification: GW Status: CM - 12/11/2018 Interval Top: 7880 ft. Interval Bottom: 7898 ft.| Completed Information for Formation DAKOTA-J-CODELL | | 1st Production Date: | 8/6/1993 | Choke Size: | | | Formation Name: | DAKOTA-J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8336 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/23/1993 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_BBLS_H2O | 22 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 135000 | | CALC_MCF_GAS | 270 | | CASING_PRESS | 1127 | | TUBING_PRESS | 686 |
| | Perforation Data: | | Interval Top: | 7880 ft. | # Of Holes: | 408 | | Interval Bottom: | 7898 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/11/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|