Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-14964
Well Classification: GW Status: PA - 12/28/2021
Well Name/No:MILE HIGH TURKEY #2-2K
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:67357
Facility Status:PAStatus Date12/28/2021
FacilityID:247167LocationID:327644
County:WELD #123Location:NWNE 2 3N66W 6
Field:WATTENBERG - #90750Elevation:4851 ft.
Planned Location:660FNL  1980 FELLat/Long: 40.259356 / -104.742080Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.258839 / -104.741410Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 12/28/2021             Measured TD: 7438 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 12/28/2021
Wellbore Permit
Permit #:19910204 Expiration Date:7/19/1991
Proposed Depth/Form:7432 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2NE

Wellbore Completed
Completion Date:4/26/1991
Spud Date:4/21/1991Spud Date Is:ACTUAL
Measured TD:7438 ft.Measured PB depth:7284 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL, FDC, CBL, GR
Log Types:Gamma Ray CCL/CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 501 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 0 ft., Bottom: 501 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7438 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 6227 ft., Bottom: 7438 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5420 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 4370 ft., Bottom: 5420 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 3098 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 1170 ft., Bottom: 3098 ft., Determination Method: CBL
Casing:String Type: S.C. 1.3, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 980 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 980 ft., Determination Method: CBL
Additional Cement:String Type: S.C. 1.1 , Top: 1170 ft., Depth: , Bottom: 3098 ft., Sacks: 700, Method:
Additional Cement:String Type: S.C. 1.1 , Top: 0 ft., Depth: , Bottom: 980 ft., Sacks: 300, Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3832 ft.NN
SUSSEX4428 ft.NN
NIOBRARA6995 ft.NN
FORT HAYS7279 ft.NN
CODELL7300 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 12/30/2010                Interval Top: 7302 ft.    Interval Bottom: 7317 ft.

 Completed Information for Formation CODELL
1st Production Date:5/11/1991Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/1/2010
Treatment Summary:Codell Trifrac Frac'd Codell w/ 128078 gals Vistar and Slick Water with 243000 lbs Ottawa sand
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7302 ft.# Of Holes:90
Interval Bottom:7317 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 12/28/2021                Interval Top: 7019 ft.    Interval Bottom: 7317 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:5/11/1991Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/1/2010
Treatment Summary:Codell & Niobrara are commingled Nothing new happened to Niobrara during Codell trifrac
Formation Treatment
Treatment Date:5/10/1991
Treatment Summary:CODL: ACIDIZE W/500 GAL 7.5% HCI, THEN FRAC W/84,840 GAL WTR W/CLAYTREAT W/40# HPG W/10,000# 100 MESH SAND & 245,000# 20/40 MESH SAND. // NBRR: ACIDIZE W/1000 GAL 7.5% HCI; FRAC W/67,000GAL WTR W/CLAYTREAT W/40# GUAR W/10,000# 100 MESH SAND & 162,000# 20/40 MESH SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 6
BTU_GAS 1305
CALC_BBLS_H2O 3
CALC_BBLS_OIL 6
CALC_GOR 20833
CALC_MCF_GAS 125
CASING_PRESS 532
GRAVITY_OIL 61
MCF_GAS 125
TUBING_PRESS 511
Perforation Data:
Interval Top:7019 ft.# Of Holes:118
Interval Bottom:7317 ft.Hole Size:

Formation NBRR                     Formation Classification:                       Status:  CM - 12/2/2021                 Interval Top: 7019 ft.    Interval Bottom: 7184 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7019 ft.# Of Holes:28
Interval Bottom:7184 ft.Hole Size:0.25 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY12/28/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No