|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 4/1/2017 Measured TD: 7311 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 4/1/2017 | | Wellbore Permit | | | Permit #: | 910063 | Expiration Date: | 5/30/1991 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: E2SE |
| | |
| Wellbore Completed | | Completion Date: | 3/16/1991 | | Measured TD: | 7311 ft. | Measured PB depth: | 7260 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 507 ft., Weight: , Citings Type: HISTORICAL | | Cement: | Sacks: 165, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7298 ft., Weight: , Citings Type: HISTORICAL | | Cement: | Sacks: 0, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3676 ft. | | | | | SUSSEX | 4330 ft. | | | | | NIOBRARA | 6839 ft. | | | | | FORT HAYS | 7130 ft. | | | | | CODELL | 7153 ft. | | | |
Formation NB-CD Formation Classification: GW Status: SI - 4/1/2017 Interval Top: 6854 ft. Interval Bottom: 7169 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/2/2006 | Choke Size: | 0.250 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/1/2006 | | Treatment Summary: | COMMINGLE CODELL & NIOBRARA. CODELL PERF: 7154'-7169' (40 HOLES) {{FROM FORMATION TREATMENT-NBRR-ABOVE: ATR= 25.6 BPM.}} |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7147 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/14/2006 | Test Method: | FLOWING | | Hours Tested: | 18 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 5 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 46400 | | CALC_MCF_GAS | 232 | | CASING_PRESS | 550 | | MCF_GAS | 232 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 6854 ft. | # Of Holes: | 268 | | Interval Bottom: | 7169 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 12/20/2005 Interval Top: 6854 ft. Interval Bottom: 6972 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/9/2005 | Choke Size: | 0.313 in. | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/7/2005 | | Treatment Summary: | REPERF NBRR:6854'-6872' (108 HOLES),6952'-6972' (120 HOLES),0.41"EHD. REFRACD VIA 2 7/8" TUBING. TREATED W/69,972 GALS SLICKWATER, 98,322 GALS SILVERSTIM W/28# GEL & 238,620# 20/40 OTTAWA SAND& 12K SB EXCEL 12/20 PROPPANT. ATP=7365PSI. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6656 ft. | | Tubing Packer Depth: | 6656 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/20/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 20 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 12750 | | CALC_MCF_GAS | 255 | | CASING_PRESS | 350 | | MCF_GAS | 255 |
| | Perforation Data: | | Interval Top: | 6854 ft. | # Of Holes: | 228 | | Interval Bottom: | 6972 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 03/31/2017 |
| Low Producing | Y | Production Period 09/2024 - 08/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|