|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 10/3/2016 Measured TD: 7939 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 10/3/2016 | | Wellbore Permit | DRIFTED | | Permit #: | 20021166 | Expiration Date: | 6/24/2003 | | Proposed Depth/Form: | 8000 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2NW | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232;318A , Unit Acreage: 320, Drill Unit: N2 |
| | |
| Wellbore Completed | | Completion Date: | 10/2/1990 | | Spud Date: | 9/14/1990 | Spud Date Is: | ACTUAL | | Measured TD: | 7939 ft. | Measured PB depth: | 7925 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, COMP.DENSITY, DIL | | Log Types: | GR,CBL. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 543 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 543 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 7485 ft., Weight: 9.3 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6535 ft., Bottom: 7485 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 2.875 in., Size: 2.375 in., Top: 7080 ft., Depth: 7937 ft., Weight: 4.7 , Citings Type: ACTUAL | | Cement: | Sacks: 6, Top: 7120 ft., Bottom: 7937 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4530 ft. | | N | N | | NIOBRARA | 7050 ft. | | N | N | | CODELL | 7337 ft. | | N | N | | J SAND | 7804 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 10/3/2016 Interval Top: 7812 ft. Interval Bottom: 7856 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/28/2002 | Choke Size: | 0.250 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/2/1990 | | Treatment Summary: | 149,000 GALS & 447,340# SAND, 2002. // J-SAND UNDER SAND PLUG, TO BE COMMINGLED AT A LATER DATE, 2006. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/17/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 17 | | BBLS_OIL | 10 | | CALC_BBLS_H2O | 17 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 83900 | | CALC_MCF_GAS | 839 | | CASING_PRESS | 750 | | MCF_GAS | 839 |
| | Perforation Data: | | Interval Top: | 7812 ft. | # Of Holes: | 66 | | Interval Bottom: | 7856 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: AB - 10/3/2016 Interval Top: 7338 ft. Interval Bottom: 7354 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/2/1990 | Choke Size: | 0.375 in. | | Formation Name: | CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/29/2007 | | Treatment Summary: | FRAC'D W/71,800 GALS & 200,000# 20/40 SAND. // RE-FRAC CODL W/127,932 GALS OF VISTAR W/26/27/28# GEL LOADINGS & 246,560#' 20/40 OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/10/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 6 | | CALC_GOR | 45000 | | MCF_GAS | 270 | | TUBING_PRESS | 360 |
| | Perforation Data: | | Interval Top: | 7338 ft. | # Of Holes: | 64 | | Interval Bottom: | 7354 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 10/10/2006 Interval Top: 7338 ft. Interval Bottom: 7856 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 8/9/2006 | Choke Size: | 0.500 in. | | Formation Name: | J-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/20/2006 | | Treatment Summary: | COMMINGLE CODELL & J SAND. J SAND UNDER SAND PLUG 10/10/2006 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/9/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 2 | | BTU_GAS | 1.1355 | | CALC_GOR | 39000 | | CASING_PRESS | 700 | | MCF_GAS | 78 | | TUBING_PRESS | 640 |
| | Perforation Data: | | Interval Top: | 7338 ft. | # Of Holes: | 166 | | Interval Bottom: | 7856 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/03/2016 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|