|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 7/18/2023 Measured TD: 7549 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 7/18/2023 | Wellbore Permit | | Permit #: | 19941090 | Expiration Date: | 2/18/1995 | Prop Depth/Form: | 7650 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEDERAL | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2SW4 |
| | |
Wellbore Completed | Completion Date: | 2/5/1995 | Spud Date: | 1/9/1995 | Spud Date Is: | ACTUAL | Measured TD: | 7549 ft. | Measured PB depth: | 7503 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DIL/SFL/GR; CBL; CDEN/GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 768 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 540, Top: 0 ft., Bottom: 768 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 7542 ft., Weight: 7.7 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 6366 ft., Bottom: 7542 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | 100 ft. | | N | N | SUSSEX | 4528 ft. | | N | N | NIOBRARA | 7132 ft. | | N | N | FORT HAYS | 7374 ft. | | N | N | CODELL | 7398 ft. | | N | N | CARLILE | 7414 ft. | | N | N | GREENHORN | 7460 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 6/20/2011 Interval Top: 7402 ft. Interval Bottom: 7406 ft. Completed Information for Formation CODELL | 1st Production Date: | 8/12/2010 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/5/2010 | Treatment Summary: | 8/5/2010 -release RBP to commingle well
| Formation Treatment | Treatment Date: | 3/19/2010 | Treatment Summary: | SET RBP @7363. OUR INTENT IS TO REMOVE THE RBP TO COMINGLE WELL IN THE NEXT SIX MONTHS. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7402 ft. | # Of Holes: | 10 | Interval Bottom: | 7406 ft. | Hole Size: | 0.33 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 6/20/2011 Interval Top: 7180 ft. Interval Bottom: 7280 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 8/12/2010 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/12/2010 | Treatment Summary: | 1/25/1995-NB Perfs 7180-7184 Holes 5 Size 0.31
3/19/2010-NB Perfs 7176-7280 Holes 88 Size 0.50
| Formation Treatment | Treatment Date: | 3/26/2010 | Treatment Summary: | REPERF NBRR 7176-7280 HOLES 88 SIZE 0.50. REFRAC NBRR W/504 GAL 15% HCL & 241,542 GAL SW & 201,520# 40/70 SAND & 4,000# 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1329 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 32 | CALC_GOR | 4063 | CALC_MCF_GAS | 130 | CASING_PRESS | 1650 | GRAVITY_OIL | 52 |
| Perforation Data: | Interval Top: | 7180 ft. | # Of Holes: | 93 | Interval Bottom: | 7280 ft. | Hole Size: | 0.5 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/18/2023 Interval Top: 7176 ft. Interval Bottom: 7408 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/5/2010 | Treatment Summary: | Release RBP over CODL to commingle well. | Formation Treatment | Treatment Date: | 2/5/1995 | Treatment Summary: | NBRR (7180'-7184', 5 HOLES) AND CODL (7402'-7406'): 400,000# 20-40 PLUS 100,506 GALS GELLED FLUID |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 40 | BTU_GAS | 1280 | CALC_BBLS_OIL | 40 | CALC_GOR | 3225 | CALC_MCF_GAS | 129 | CASING_PRESS | 1200 | GRAVITY_OIL | 54 | MCF_GAS | 129 | TUBING_PRESS | 600 |
| Perforation Data: | Interval Top: | 7176 ft. | # Of Holes: | 151 | Interval Bottom: | 7408 ft. | Hole Size: | 0.31 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|