|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/22/2018 Measured TD: 8140 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/22/2018 | | Wellbore Permit | DRIFTED | | Permit #: | 20021830 | Expiration Date: | 10/18/2002 | | Proposed Depth/Form: | 8140 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: S2 |
| | |
| Wellbore Completed | | Completion Date: | 10/24/1990 | | Spud Date: | 6/26/1990 | Spud Date Is: | ACTUAL | | Measured TD: | 8140 ft. | Measured PB depth: | 8065 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | DIL-SP-GR DCPL-GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 385 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 0 ft., Bottom: 385 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8072 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 6891 ft., Bottom: 8072 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7122 ft. | | | | | FORT HAYS | 7395 ft. | | | | | CODELL | 7416 ft. | | | | | J SAND | 7844 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 2/22/2018 Interval Top: 7852 ft. Interval Bottom: 7886 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/24/1990 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 80 | | BBLS_OIL | 20 | | CALC_BBLS_H2O | 80 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 85600 | | CALC_MCF_GAS | 1712 | | CASING_PRESS | 1780 | | MCF_GAS | 1712 |
| | Perforation Data: | | Interval Top: | 7852 ft. | # Of Holes: | 100 | | Interval Bottom: | 7886 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 1/17/2003 Interval Top: 7422 ft. Interval Bottom: 7910 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/24/1990 | | Treatment Summary: | RELEASE PKR. LAY DOWN FRAC STRING. RE-RELEASE RBP. TOH W/TGH. TIH W/PROD TBG. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7842 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/17/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 14 | | BBLS_OIL | 34 | | CALC_BBLS_H2O | 14 | | CALC_BBLS_OIL | 34 | | CALC_GOR | 9029 | | CALC_MCF_GAS | 307 | | CASING_PRESS | 640 | | MCF_GAS | 307 | | TUBING_PRESS | 360 |
| | Perforation Data: | | Interval Top: | 7422 ft. | # Of Holes: | 68 | | Interval Bottom: | 7910 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 8/14/2013 Interval Top: 7418 ft. Interval Bottom: 7438 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/22/2013 | Treatment End Date: | 6/22/2013 | | Treatment Summary: | Set CIBP @ 7490'. Frac Codell w/125,140 # sand and 41,273 gals (983 bbls) frac fluid. | | Total fluid used in treatment (bbls): | 983 | Max pressure during treatment (psi): | 6450 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.91 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 804 | | Fresh water used in treatment (bbls): | 983 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 125140 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 10/24/1990 | | Treatment Summary: | SEE SCANNED DOC. #1098815 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 24 | | BBLS_OIL | 39 | | CALC_BBLS_H2O | 24 | | CALC_BBLS_OIL | 39 | | CALC_GOR | 2872 | | CALC_MCF_GAS | 112 | | MCF_GAS | 112 | | TUBING_PRESS | 320 |
| | Perforation Data: | | Interval Top: | 7418 ft. | # Of Holes: | 100 | | Interval Bottom: | 7438 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/14/2013 Interval Top: 7208 ft. Interval Bottom: 7844 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 7/22/2013 | Treatment End Date: | N/A | | Treatment Summary: | Drill out CIBP. Landed tbg @ 7816'. Well was returned to production on 7/17/2013 commingling the J-Sand, Niobrara and Codell. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 10/24/1990 | | Treatment Summary: | JNBCD COMMINGLE; DRILLED OUT CIBP @7300'. 3/28/08. DRILLED OUT CIBP @7520' AND 7540' TO COMMINGLE JNBCD. 3/30/08 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7816 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/22/2013 | Test Method: | FLOW | | Hours Tested: | 1 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 2 | | BTU_GAS | 1242 | | CALC_BBLS_H2O | 120 | | CALC_BBLS_OIL | 48 | | CALC_GOR | 8500 | | CALC_MCF_GAS | 408 | | CASING_PRESS | 257 | | GRAVITY_OIL | 52 | | MCF_GAS | 17 | | TUBING_PRESS | 224 |
| | Perforation Data: | | Interval Top: | 7208 ft. | # Of Holes: | 188 | | Interval Bottom: | 7844 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/22/2018 Interval Top: 7208 ft. Interval Bottom: 7438 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/30/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/9/2008 | | Treatment Summary: | NB-CD RECOMPLETION: SET CIBP @ 7540' 2/29/08.SET CIBP @7520' 3/5/08. RE FRAC CODL W/119,280 GAL FRAC FLD & 253,640# SND.3/9/08. SET CIBP @7300' 3/13/08.FRAC NBRR W/145,900 GAL FRAC FLD & 254,360# SND 3/23/08 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7208 ft. | # Of Holes: | 100 | | Interval Bottom: | 7438 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/22/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|