Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-14617
Well Classification: GW Status: SI - 3/1/2022
Well Name/No:CANNON LAND UPRR 41-3 #2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date3/1/2022
FacilityID:246820LocationID:327393
County:WELD #123Location:NENE 3 2N66W 6
Field:WATTENBERG - #90750Elevation:5023 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:540FNL  660 FELLat/Long: 40.172937 / -104.756089Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.172940 / -104.756040Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 3/1/2022             Measured TD: 8078 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 3/1/2022
Wellbore Permit
Permit #:19980475 Expiration Date:5/25/1999
Proposed Depth/Form:8070 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JNBCD , Formation: J-NIOBRARA-CODELL , Order: 232 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2NE

Wellbore Completed
Completion Date:11/18/1998
Spud Date:5/29/1990Spud Date Is:ACTUAL
Measured TD:8078 ft.Measured PB depth:8048 ft.
True Vertical TD:True Vertical PB depth:
Log Types:FDCNGR, IGL, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 701 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 701 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7592 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 0, Top: 6600 ft., Bottom: 7592 ft., Determination Method:
Casing:String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7539 ft., Depth: 8078 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 7450 ft., Bottom: 8078 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4484 ft.
NIOBRARA7173 ft.
FORT HAYS7432 ft.
CODELL7455 ft.
J SAND7914 ft.

Formation JSND                     Formation Classification:  GW                     Status:  SI - 3/1/2022                  Interval Top: 7916 ft.    Interval Bottom: 7966 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/18/1998
Treatment Summary:560,480# 20/40 MESH, 239,820 GAL GELLED FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7916 ft.# Of Holes:
Interval Bottom:7966 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 7/14/1990                 Interval Top: 7456 ft.    Interval Bottom: 7473 ft.

 Completed Information for Formation CODELL
1st Production Date:7/10/1990Choke Size:0.125 in.
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/18/1998
Treatment Summary:5,000# 100 MESH; 189,000# 20/40 MESH, 73,500 GAL GELLED FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/14/1990Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 52
CALC_GOR 3154
CASING_PRESS 750
MCF_GAS 164
Perforation Data:
Interval Top:7456 ft.# Of Holes:40
Interval Bottom:7473 ft.Hole Size:0.32 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 10/1/2019                 Interval Top: 7216 ft.    Interval Bottom: 7966 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7504 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/17/1999Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 5
CALC_BBLS_OIL 85800
CASING_PRESS 500
GRAVITY_OIL 60
MCF_GAS 429
TUBING_PRESS 325
Perforation Data:
Interval Top:7216 ft.# Of Holes:
Interval Bottom:7966 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 3/1/2022

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/8/1992Choke Size:0.156 in.
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/12/1992Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 24
CALC_GOR 50.4
CASING_PRESS 360
MCF_GAS 90
No Perforation Data was found for formation NB-CD.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
02/28/2022
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No