|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 6/8/2020 Measured TD: 6848 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 6/8/2020 | | Wellbore Permit | | | Permit #: | 19900193 | Expiration Date: | 6/27/1990 | | Proposed Depth/Form: | 6900 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | SOONER | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 0 , Unit Acreage: 40, Drill Unit: SENW |
| | |
| Wellbore Completed | | Completion Date: | 5/30/1990 | | Spud Date: | 4/10/1990 | Spud Date Is: | ACTUAL | | Measured TD: | 6848 ft. | Measured PB depth: | 6792 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | DIL, DENSITY, NEUTRON, GAMMA RAY | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 256 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 180, Top: 0 ft., Bottom: 256 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 6640 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 6280 ft., Bottom: 6640 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 5580 ft. | | | | | FORT HAYS | 5804 ft. | | | | | CODELL | 5853 ft. | | | | | BENTONITE | 6198 ft. | | | | | D SAND | 6294 ft. | | | | | J SAND | 6387 ft. | | | | | DAKOTA | 6614 ft. | | | | | LAKOTA | 6694 ft. | | | |
Formation DKTA Formation Classification: GW Status: AB - 12/9/1991 Interval Top: 6652 ft. Interval Bottom: 6754 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | 6/1/1990 | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/30/1990 | | Treatment Summary: | SEE SCANNED DOCUMENT # 00248839 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DKTA. |
| | Perforation Data: | | Interval Top: | 6652 ft. | # Of Holes: | 140 | | Interval Bottom: | 6754 ft. | Hole Size: | 0.5 in. |
|
Formation DK-J Formation Classification: GW Status: AB - 12/9/1991 Interval Top: 6388 ft. Interval Bottom: 6754 ft.| Completed Information for Formation DAKOTA-JSND | | 1st Production Date: | 6/1/1990 | Choke Size: | | | Formation Name: | DAKOTA-JSND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/30/1990 | Test Method: | PUMPING | | Hours Tested: | 4 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 440 | | CALC_BBLS_H2O | 2640 |
| | Perforation Data: | | Interval Top: | 6388 ft. | # Of Holes: | 260 | | Interval Bottom: | 6754 ft. | Hole Size: | 0.5 in. |
|
Formation JSND Formation Classification: GW Status: AB - 12/9/1991 Interval Top: 6388 ft. Interval Bottom: 6450 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/1/1990 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/30/1990 | | Treatment Summary: | SEE SCANNED DOCUMENT # 00248839 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 6388 ft. | # Of Holes: | 120 | | Interval Bottom: | 6450 ft. | Hole Size: | 0.5 in. |
|
Formation DSND Formation Classification: GW Status: AB - 6/8/2020 Interval Top: 6310 ft. Interval Bottom: 6330 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 12/9/1991 | Choke Size: | | | Formation Name: | D SAND | Commingled: | | | Production Method: | ROD PUMP | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/30/1990 | | Treatment Summary: | 35,700 GAL GELLED WATER & 25,000# RESIN COATED 20/40 SAND |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6337 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/29/1991 | Test Method: | ROD PUMP | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 132 | | BBLS_OIL | 183 | | CALC_GOR | 213 | | CASING_PRESS | 50 | | GRAVITY_OIL | 40 | | MCF_GAS | 39 |
| | Perforation Data: | | Interval Top: | 6310 ft. | # Of Holes: | 40 | | Interval Bottom: | 6330 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/08/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|