|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/14/2016 Measured TD: 7780 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/14/2016 | | Wellbore Permit | DRIFTED | | Permit #: | 20063684 | Expiration Date: | 9/11/2007 | | Proposed Depth/Form: | 7780 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2NW4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: W2NW4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 80, Drill Unit: W2NW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 885 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 540, Top: 0 ft., Bottom: 885 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 7780 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 6024 ft., Bottom: 7780 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/15/1990 | | Spud Date: | 11/3/1989 | Spud Date Is: | ACTUAL | | Measured TD: | 7780 ft. | Measured PB depth: | 7718 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL-SP-GR-LAT-GR-CAL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 885 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 540, Top: 0 ft., Bottom: 885 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7780 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 6030 ft., Bottom: 7780 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | D SAND | 7542 ft. | | | | | J SAND | 7600 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 4/14/2016 Interval Top: 7603 ft. Interval Bottom: 7663 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/15/1990 | | Treatment Summary: | DRILL THROUGH CIBP @ 7405. RETURN J SAND TO PRODUCTION. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | BBLS_OIL | 2 | | CALC_GOR | 243500 | | CASING_PRESS | 420 | | MCF_GAS | 487 | | TUBING_PRESS | 220 |
| | Perforation Data: | | Interval Top: | 7603 ft. | # Of Holes: | 200 | | Interval Bottom: | 7663 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: AB - 4/14/2016 Interval Top: 7155 ft. Interval Bottom: 7168 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/9/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/30/2007 | | Treatment Summary: | FRAC'D CODELL W/127,848 GALS OF SILVERSTIM 32 AND 270,480#'S OF 20/40 OTTAWA SAND. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7105 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/24/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 36 | | BTU_GAS | 1159 | | CALC_GOR | 556 | | CASING_PRESS | 1100 | | GRAVITY_OIL | 44 | | MCF_GAS | 20 | | TUBING_PRESS | 1100 |
| | Perforation Data: | | Interval Top: | 7155 ft. | # Of Holes: | 52 | | Interval Bottom: | 7168 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 6/27/2008 Interval Top: 7155 ft. Interval Bottom: 7663 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.500 in. | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/15/1990 | | Treatment Summary: | COMMINGLE THE J SAND, NIOBRARA AND CODELL. WELL WAS TURNED ON 6/13/08. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7576 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/27/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 8 | | BTU_GAS | 1165 | | CALC_BBLS_H2O | 8 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 20000 | | CALC_MCF_GAS | 160 | | CASING_PRESS | 400 | | GRAVITY_OIL | 45 | | MCF_GAS | 160 | | TUBING_PRESS | 380 |
| | Perforation Data: | | Interval Top: | 7155 ft. | # Of Holes: | 252 | | Interval Bottom: | 7663 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/14/2016 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|