Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-14432
Well Classification: OW Status: PA - 4/14/2021
Well Name/No:HSR-FEDERAL #15-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 49190
Facility Status:PAStatus Date4/14/2021
FacilityID:246635LocationID:336303
County:WELD #123Location:SWSE 36 3N66W 6
Field:WATTENBERG - #90750Elevation:4993 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FSL  1980 FELLat/Long: 40.176327 / -104.723008Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.176511 / -104.723061Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 4/14/2021             Measured TD: 7999 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 4/14/2021
Wellbore Permit
Permit #:20031108 Expiration Date:6/24/2004
Proposed Depth/Form:8000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: W2SE4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:N/A
Spud Date:3/21/1990Spud Date Is:ACTUAL
Measured TD:7999 ft.Measured PB depth:7967 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL/SFL/GR; CBL; DEN/CNL/GR
Log Types:CDL-GR, ISP-GR, CBL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 753 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 0 ft., Bottom: 753 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7518 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: 6161 ft., Bottom: 7518 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1521 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 215, Top: 502 ft., Bottom: 1520 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7448 ft., Depth: 7968 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 35, Top: 7448 ft., Bottom: 7968 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 502 ft., Depth: 1521 ft., Bottom: 1520 ft., Sacks: 215, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7113 ft.7358 ft.NN
FORT HAYS7358 ft.7382 ft.NN
CODELL7382 ft.7399 ft.NN
GREENHORN7469 ft.
J SAND7821 ft.7840 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 4/14/2021                 Interval Top: 7840 ft.    Interval Bottom: 7892 ft.

 Completed Information for Formation J SAND
1st Production Date:12/31/2003Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/31/2010
Treatment Summary:SET SAND PLUG @ 7620'. OUR INTENT IS TO REMOVE THE SAND PLUG TO COMMINGLE WELL IN THE NEXT SIX MONTHS.
Formation Treatment
Treatment Date:12/31/2003
Treatment Summary:115,460# 30/50 MESH SAND; 151,032 GALLONS GELLED FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7840 ft.# Of Holes:78
Interval Bottom:7892 ft.Hole Size:0.21 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 10/13/2011                Interval Top: 7383 ft.    Interval Bottom: 7399 ft.

 Completed Information for Formation CODELL
1st Production Date:5/18/1990Choke Size:0.140 in.
Formation Name:CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:12/31/2003
Treatment Summary:24,000# 100 MESH; 500,000# 20-40 MESH SAND; 87,370 GALS GELLED FLUID
Tubing Size:2.375 in.Tubing Setting Depth:7321 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/30/1990Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 31
CALC_BBLS_H2O 0
CALC_BBLS_OIL 31
CALC_GOR 4839
CALC_MCF_GAS 150
CASING_PRESS 1600
GRAVITY_OIL 60
MCF_GAS 150
TUBING_PRESS 950
Perforation Data:
Interval Top:7383 ft.# Of Holes:32
Interval Bottom:7399 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 1/1/2004                  Interval Top: 7116 ft.    Interval Bottom: 7877 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:1/1/2004Choke Size:0.250 in.
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:PLUNGER LIFT
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7968 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/1/2004Test Method:PLUNGER
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 3
CALC_BBLS_H2O 0
CALC_BBLS_OIL 3
CALC_GOR 84667
CALC_MCF_GAS 254
CASING_PRESS 500
GRAVITY_OIL 45.8
MCF_GAS 254
TUBING_PRESS 200
Perforation Data:
Interval Top:7116 ft.# Of Holes:123
Interval Bottom:7877 ft.Hole Size:0.21 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 4/14/2021                 Interval Top: 7116 ft.    Interval Bottom: 7399 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/28/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/12/2010
Treatment Summary:NBRR PERF 7116-7180 HOLES 13 SIZE 0.38. CODL PERFF 7383-7399 HOLES 64 SIZE 0.38. REPEFRF CODL 7383-7399 HOLES 32 SIZE 0.38. REFRAC CODL W/201,621 GAL SW & 150,640# 40/70 SAND & 4,000# 20/40 SB EXCEL.
Tubing Size:2.375 in.Tubing Setting Depth:7338 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/9/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 39
BTU_GAS 1248
CALC_BBLS_H2O 0
CALC_BBLS_OIL 29
CALC_GOR 4586
CALC_MCF_GAS 133
CASING_PRESS 1675
GRAVITY_OIL 54
MCF_GAS 87
TUBING_PRESS 625
Perforation Data:
Interval Top:7116 ft.# Of Holes:77
Interval Bottom:7399 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 9/16/1991                 Interval Top: 7116 ft.    Interval Bottom: 7180 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/31/1991Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:12/31/2003
Treatment Summary:214,000# 20-40 MESH; 54,234 GALS GELLED WATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/2/1991Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 43
CALC_BBLS_H2O 0
CALC_BBLS_OIL 43
CALC_GOR 3512
CALC_MCF_GAS 151
CASING_PRESS 900
GRAVITY_OIL 60
MCF_GAS 151
TUBING_PRESS 625
Perforation Data:
Interval Top:7116 ft.# Of Holes:13
Interval Bottom:7180 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/14/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No