Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-14401
Well Classification: GW Status: PA - 6/1/2018
Well Name/No:WRIGHT-USX UU #11-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/1/2018
FacilityID:246604LocationID:327259
Municipality/County:DACONO / WELD #123Location:SWNW 11 1N68W 6
Field:WATTENBERG - #90750Elevation:5023 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1640FNL  1320 FWLLat/Long: 40.068517 / -104.975305Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.068488 / -104.975281Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 6/1/2018             Measured TD: 8439 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 6/1/2018
Wellbore Permit
Permit #:19890738 Expiration Date:9/13/2000
Proposed Depth/Form:8445 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: NW4

Wellbore Completed
Completion Date:2/27/1990
Spud Date:9/30/1989Spud Date Is:PLANNED
Measured TD:8439 ft.Measured PB depth:8326 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL/SP/GR/CNL/LDT/NGT/ML/CAL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 923 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 923 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 8439 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 6630 ft., Bottom: 8439 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4350 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 4064 ft., Bottom: 4352 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 6200 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 5496 ft., Bottom: 6240 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
J SAND8222 ft.

Formation DKTA                     Formation Classification:  GW                     Status:  AB - 6/1/2018                  Interval Top: 8390 ft.    Interval Bottom: 8404 ft.

 Completed Information for Formation DAKOTA
1st Production Date:3/28/1997Choke Size: 
Formation Name:DAKOTACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/27/1990
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 0
CALC_BBLS_H2O 4
CALC_BBLS_OIL 0
CALC_MCF_GAS 700
MCF_GAS 700
Perforation Data:
Interval Top:8390 ft.# Of Holes:56
Interval Bottom:8404 ft.Hole Size:

Formation JSND                     Formation Classification:  GW                     Status:  AB - 6/1/2018                  Interval Top: 8222 ft.    Interval Bottom: 8248 ft.

 Completed Information for Formation J SAND
1st Production Date:1/29/1990Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/27/1990
Treatment Summary:FRAC DOWN CSG. W/ 159,978 GAL 40# GEL, 905,000# 20/40 M, FLUSH W/ 186 BW. ATP = 2,400 PSI, AIR = 40 BPM
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 103
BBLS_OIL 0
CALC_BBLS_H2O 51
CALC_BBLS_OIL 0
CALC_MCF_GAS 241
CASING_PRESS 420
MCF_GAS 483
TUBING_PRESS 215
Perforation Data:
Interval Top:8222 ft.# Of Holes:104
Interval Bottom:8248 ft.Hole Size:0.5 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/17/2017                 Interval Top: 7783 ft.    Interval Bottom: 7793 ft.

 Completed Information for Formation CODELL
1st Production Date:10/3/1999Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7783 ft.# Of Holes:
Interval Bottom:7793 ft.Hole Size:

Formation DKJNC                   Formation Classification:  GW                   Status:  CM - 6/1/2018                  Interval Top: 7445 ft.    Interval Bottom: 8404 ft.

 Completed Information for Formation DAKOTA-J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:DAKOTA-J-NIOBRARA-CODELLCommingled:Yes
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/27/1990
Treatment Summary:REMOVED RBP AND CM DKJNC
Tubing Size:2.375 in.Tubing Setting Depth:8375 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/7/2000Test Method:PLUNGER
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 7
CALC_BBLS_H2O 0
CALC_BBLS_OIL 7
CALC_GOR 51429
CALC_MCF_GAS 360
CASING_PRESS 380
GRAVITY_OIL 60
MCF_GAS 360
TUBING_PRESS 300
Perforation Data:
Interval Top:7445 ft.# Of Holes:
Interval Bottom:8404 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 6/1/2018                  Interval Top: 7445 ft.    Interval Bottom: 7793 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/3/1999Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/27/1990
Treatment Summary:FRAC'D NB-CD W/8520# 100 MESH; 367900# 20/40 MESH; 110418 GAL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 20
CALC_BBLS_H2O 0
CALC_BBLS_OIL 20
CALC_GOR 9450
CALC_MCF_GAS 189
CASING_PRESS 680
GRAVITY_OIL 60
MCF_GAS 189
TUBING_PRESS 180
Perforation Data:
Interval Top:7445 ft.# Of Holes:21
Interval Bottom:7793 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/17/2017                 Interval Top: 7445 ft.    Interval Bottom: 7567 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/3/1999Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7445 ft.# Of Holes:
Interval Bottom:7567 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/01/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No