|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/9/2016 Measured TD: 7895 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/9/2016 | | Wellbore Permit | DRIFTED | | Permit #: | 20063698 | Expiration Date: | 9/11/2007 | | Proposed Depth/Form: | 8010 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NW4 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NW4 |
| | |
| Wellbore Completed | | Completion Date: | 2/7/1990 | | Spud Date: | 8/29/1989 | Spud Date Is: | ACTUAL | | Measured TD: | 7895 ft. | Measured PB depth: | 7811 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | NEUTRON POROSITY, LATERAL, MICRO, GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 302 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 0 ft., Bottom: 302 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7895 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 270, Top: 6662 ft., Bottom: 7895 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 2.875 in., Size: , Top: 7871 ft., Depth: 8010 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 912 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 228 ft., Bottom: 912 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | J SAND | 7682 ft. | | | |
Formation DKTA Formation Classification: GW Status: AB - 5/9/2016 Interval Top: 7917 ft. Interval Bottom: 7955 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Date: | 2/7/1990 | | Treatment Summary: | DAKOTA UNDER RBP |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 116 | | BBLS_OIL | 17 | | MCF_GAS | 491 |
| | Perforation Data: | | Interval Top: | 7917 ft. | # Of Holes: | | | Interval Bottom: | 7955 ft. | Hole Size: | |
|
Formation JSND Formation Classification: GW Status: AB - 5/9/2016 Interval Top: 7682 ft. Interval Bottom: 7730 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/20/1990 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/7/1990 | | Treatment Summary: | J SAND UNDER RBP |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 28 | | BBLS_OIL | 4 | | CALC_BBLS_H2O | 78 | | CALC_BBLS_OIL | 11 | | CALC_GOR | 19000 | | CALC_MCF_GAS | 209 | | CASING_PRESS | 840 | | MCF_GAS | 75 | | TUBING_PRESS | 740 |
| | Perforation Data: | | Interval Top: | 7682 ft. | # Of Holes: | 152 | | Interval Bottom: | 7730 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: AB - 2/9/2021 Interval Top: 7234 ft. Interval Bottom: 7246 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/5/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/25/2007 | | Treatment Summary: | CODELL WAS FRAC'D W/128,814 GAL SILVERSTIM 32 AND 270,800#'S OF 20/40 OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 23 | | BTU_GAS | 1319 | | CALC_GOR | 173 | | CASING_PRESS | 1300 | | GRAVITY_OIL | 48 | | MCF_GAS | 4 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 7234 ft. | # Of Holes: | 48 | | Interval Bottom: | 7246 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/09/2016 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|