|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 11/1/2022 Measured TD: 7855 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 11/1/2022 | | Wellbore Permit | | | Permit #: | 19890668 | Expiration Date: | 4/15/2002 | | Proposed Depth/Form: | 7855 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: NE/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: N2 |
| | |
| Wellbore Completed | | Completion Date: | 4/12/1990 | | Spud Date: | 9/17/1989 | Spud Date Is: | ACTUAL | | Measured TD: | 7855 ft. | Measured PB depth: | 7746 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | DIL-SP-GR-CNL-LDT-GR-ML-CAL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 273 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 160, Top: 0 ft., Bottom: 273 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7855 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 270, Top: 6702 ft., Bottom: 7855 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 917 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 0 ft., Bottom: 917 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | J SAND | 7618 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 11/1/2022 Interval Top: 7620 ft. Interval Bottom: 7660 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/25/1990 | Choke Size: | 0.750 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7600 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/12/1990 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 25 | | CALC_BBLS_H2O | 25 | | CALC_GOR | 550000 | | CALC_MCF_GAS | 550 | | CASING_PRESS | 380 | | MCF_GAS | 550 | | TUBING_PRESS | 140 |
| | Perforation Data: | | Interval Top: | 7620 ft. | # Of Holes: | 36 | | Interval Bottom: | 7660 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/01/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|